Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,948
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0100 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,700 | $3,000 | Implemented |
TT0100 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $407 | $150 | Implemented |
TT0100 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $830 | $4,500 | Implemented |
TT0100 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $126 | $360 | Implemented |
TT0100 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $660 | $3,000 | Implemented |
DL0095 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,056 | $700 | Not Implemented |
DL0095 # 02 Y:2012 | 02 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $6,024 | $600 | Not Implemented |
DL0095 # 03 Y:2012 | 03 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,524 | $28,000 | Not Implemented |
DL0095 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,942 | $13,697 | Not Implemented |
DL0095 # 05 Y:2012 | 05 | 2012 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $18,910 | $6,300 | Not Implemented |
MZ0098 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $57,632 | $23,700 | Implemented |
MZ0098 # 02 Y:2012 | 02 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $42,267 | $26,000 | Implemented |
MZ0098 # 03 Y:2012 | 03 | 2012 | USE RADIANT HEATER FOR SPOT HEATING | $35,790 | $36,000 | Implemented |
MZ0098 # 04 Y:2012 | 04 | 2012 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $9,018 | $250 | Implemented |
MZ0098 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $5,896 | $3,000 | Implemented |
MZ0098 # 06 Y:2012 | 06 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,872 | $400 | Implemented |
MZ0098 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,271 | $1,283 | Implemented |
MZ0098 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,269 | $850 | Not Implemented |
MAS030 # 01 Y:2012 | 01 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $8,427 | $2,500 | Not Implemented |
MAS030 # 02 Y:2012 | 02 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $5,241 | $1,500 | Not Implemented |
MAS030 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,092 | $0 | Implemented |
MAS030 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,379 | $0 | Implemented |
MAS030 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $2,333 | $4,400 | Not Implemented |
MAS030 # 06 Y:2012 | 06 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,098 | $500 | Not Implemented |
NC0465 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $807 | $400 | Implemented |