IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0222 # 12 Y:1998 12 1998 CLEAR AND RENT EXISTING SPACE $67,788 $3,600 Not Implemented
AS0202 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,012 $11,499 Implemented
AS0202 # 02 Y:1997 02 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,445 $8,160 Not Implemented
AS0202 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,839 $12 Implemented
AS0202 # 04 Y:1997 04 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,907 $3,500 Not Implemented
AS0202 # 05 Y:1997 05 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,182 $3,000 Implemented
AS0202 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,084 $9,599 Implemented
AS0202 # 07 Y:1997 07 1997 INSTALL OCCUPANCY SENSORS $766 $1,350 Not Implemented
AS0202 # 08 Y:1997 08 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,753 $0 Not Implemented
AS0202 # 09 Y:1997 09 1997 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $665 $0 Implemented
AS0202 # 10 Y:1997 10 1997 TREAT AND REUSE RINSE WATERS $940 $500 Implemented
AS0202 # 11 Y:1997 11 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,407 $200 Not Implemented
AS0202 # 12 Y:1997 12 1997 CLEAR AND RENT EXISTING SPACE $93,500 $750 Not Implemented
AS0200 # 01 Y:1997 01 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,061 $18,500 Not Implemented
AS0200 # 02 Y:1997 02 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,941 $17 Not Implemented
AS0200 # 03 Y:1997 03 1997 INSTALL TIMERS AND/OR THERMOSTATS $1,567 $1,440 Implemented
AS0200 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,154 $224 Implemented
AS0200 # 05 Y:1997 05 1997 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $464 $621 Implemented
AS0200 # 06 Y:1997 06 1997 INSTALL OCCUPANCY SENSORS $313 $300 Not Implemented
AS0200 # 07 Y:1997 07 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,346 $14,000 Implemented
AS0200 # 08 Y:1997 08 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,344 $34 Not Implemented
AS0200 # 09 Y:1997 09 1997 ELIMINATE SHIFT $26,201 $100 Implemented
AS0179 # 01 Y:1996 01 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,521 $21,600 Implemented
AS0179 # 02 Y:1996 02 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,187 $7,700 Not Implemented
AS0179 # 03 Y:1996 03 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,307 $12,000 Not Implemented