IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0290 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $739 $159 Not Implemented
SU0290 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,630 $486 Not Implemented
SU0290 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $421 $357 Implemented
SU0290 # 09 Y:2010 09 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $186 $268 Implemented
SU0290 # 10 Y:2010 10 2010 RECOVER WASTE HEAT FROM EQUIPMENT $11,876 $11,749 Not Implemented
SU0290 # 11 Y:2010 11 2010 REDUCE VENTILATION AIR $7,633 $10,197 Implemented
SU0290 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $139 $335 Implemented
SU0290 # 13 Y:2010 13 2010 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,956 $20,410 Not Implemented
SU0290 # 14 Y:2010 14 2010 OPTIMIZE PLANT POWER FACTOR $1,087 $6,486 Implemented
UM0360 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $8,778 $1,000 Not Implemented
UM0360 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,841 $24,120 Not Implemented
UM0360 # 03 Y:2010 03 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $24,348 $8,750 Not Implemented
UM0360 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $14,135 $31,924 Not Implemented
UM0360 # 05 Y:2010 05 2010 OPTIMIZE PLANT POWER FACTOR $6,734 $14,340 Not Implemented
UM0360 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,240 $200 Not Implemented
UM0360 # 07 Y:2010 07 2010 USE RADIANT HEATER FOR SPOT HEATING $45,305 $14,000 Not Implemented
UM0360 # 08 Y:2010 08 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,583 $2,000 Not Implemented
UM0360 # 09 Y:2010 09 2010 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $6,913 $2,000 Not Implemented
AM0568 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $55,000 $46,000 Not Implemented
AM0568 # 02 Y:2010 02 2010 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $43,900 $0 Not Implemented
AM0568 # 03 Y:2010 03 2010 OPTIMIZE PLANT POWER FACTOR $22,400 $54,380 Not Implemented
AM0568 # 04 Y:2010 04 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,780 $500 Not Implemented
AM0568 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,655 $2,000 Not Implemented
AM0568 # 06 Y:2010 06 2010 INSTALL SKYLIGHTS $4,820 $13,100 Not Implemented
AM0568 # 07 Y:2010 07 2010 REPAIR OR REPLACE STEAM TRAPS $2,920 $1,845 Not Implemented