IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0368 # 08 Y:2008 08 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,812 $56,073 Implemented
SF0368 # 09 Y:2008 09 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $88,956 $1,020,250 Not Implemented
NC0384 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $10,481 $5,000 Implemented
NC0384 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,352 $100 Implemented
NC0384 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,929 $7,700 Not Implemented
NC0384 # 04 Y:2008 04 2008 DEVELOP A REPAIR/REPLACE POLICY $1,428 $3,142 Not Implemented
NC0384 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $1,068 $271 Implemented
NC0384 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,272 $5,000 Implemented
NC0384 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,112 $500 Implemented
UM0341 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $101,548 $18,088 Not Implemented
UM0341 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $79,804 $53,414 Implemented
UM0341 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $31,965 $59,142 Not Implemented
UM0341 # 04 Y:2008 04 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,835 $4,800 Not Implemented
UM0341 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,572 $5,000 Not Implemented
UM0341 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,111 $8,160 Not Implemented
UM0341 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,356 $515 Not Implemented
UD0787 # 01 Y:2008 01 2008 REDUCE VENTILATION AIR $47,843 $62,700 Implemented
UD0787 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,242 $107,122 Implemented
UD0787 # 03 Y:2008 03 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,341 $6,560 Not Implemented
UD0787 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $9,025 $2,424 Implemented
UD0787 # 05 Y:2008 05 2008 OPTIMIZE PLANT POWER FACTOR $7,098 $39,000 Not Implemented
UD0787 # 06 Y:2008 06 2008 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,330 $300 Not Implemented
UD0787 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,714 $2,828 Not Implemented
UD0787 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,656 $0 Not Implemented
UD0787 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,351 $1,000 Implemented