IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

521

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0356 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,151 $0 Not Implemented
SD0356 # 06 Y:2005 06 2005 USE EVAPORATION TO CONCENTRATE MATERIAL $18,769 $25,650 Not Implemented
SD0356 # 07 Y:2005 07 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,230 $18,500 Not Implemented
SD0347 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,911 $450 Implemented
SD0347 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,552 $0 Implemented
SD0347 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,721 $21,387 Not Implemented
SD0347 # 04 Y:2004 04 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,700 $18,500 Not Implemented
SD0347 # 05 Y:2004 05 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $128,000 $145,000 Not Implemented
LM0076 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $528 $25 Implemented
LM0076 # 02 Y:2004 02 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,952 $1,300 Implemented
LM0076 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $255 $281 Implemented
LM0076 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,953 $3,825 Not Implemented
LM0076 # 05 Y:2004 05 2004 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,736 $2,500 Implemented
LM0076 # 06 Y:2004 06 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,766 $1,500 Not Implemented
LM0076 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,513 $880 Implemented
SD0332 # 01 Y:2004 01 2004 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $164,104 $609,600 Not Implemented
SD0332 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,679 $475 Implemented
SD0332 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,765 $900 Implemented
SD0332 # 04 Y:2004 04 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,750 $6,000 Not Implemented
SD0332 # 05 Y:2004 05 2004 INSTALL SKYLIGHTS $3,460 $7,015 Not Implemented
SD0331 # 01 Y:2004 01 2004 USE PHOTOCELL CONTROLS $4,358 $410 Not Implemented
SD0331 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $643 $453 Not Implemented
SD0331 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $204 $0 Not Implemented
SD0331 # 04 Y:2004 04 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,220 $5,000 Implemented
SD0331 # 05 Y:2004 05 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $108,200 $110,000 Implemented