IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0127 # 08 Y:2006 08 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,107 $3,878 Implemented
IC0114 # 01 Y:2006 01 2006 INSTALL TURBULATORS $42,000 $7,500 Not Implemented
IC0114 # 02 Y:2006 02 2006 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $16,000 $84,000 Not Implemented
IC0114 # 03 Y:2006 03 2006 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $19,000 $63,000 Implemented
IC0114 # 04 Y:2006 04 2006 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $175,000 $120,400 Not Implemented
IC0114 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $8,400 $16,800 Not Implemented
IC0114 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,216 $5,280 Not Implemented
IC0114 # 07 Y:2006 07 2006 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $93,057 $456,000 Not Implemented
IC0114 # 08 Y:2006 08 2006 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $91,228 $834,000 Not Implemented
IC0114 # 09 Y:2006 09 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,414 $65,273 Implemented
IC0114 # 10 Y:2006 10 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,000 $8,400 Implemented
IC0114 # 11 Y:2006 11 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $4,400 $1,200 Implemented
IC0114 # 12 Y:2006 12 2006 REPAIR AND ELIMINATE STEAM LEAKS $2,000 $2,800 Implemented
IC0114 # 13 Y:2006 13 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,383 $9,400 Implemented
MS0291 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $224,456 $74,722 Not Implemented
MS0291 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $42,324 $29,520 Implemented
MS0291 # 03 Y:2006 03 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $38,212 $8,550 Not Implemented
MS0291 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $28,523 $2,000 Not Implemented
MS0291 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,397 $233 Implemented
MS0291 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,825 $34,509 Not Implemented
MS0291 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $10,794 $1,853 Implemented
MS0291 # 08 Y:2006 08 2006 REPAIR AND ELIMINATE STEAM LEAKS $9,158 $169 Not Implemented
MS0291 # 09 Y:2006 09 2006 AIR CONDITION ONLY SPACE NECESSARY $6,088 $600 Not Implemented
MS0291 # 10 Y:2006 10 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $973 $0 Not Implemented
WI0511 # 01 Y:2006 01 2006 AUTOMATE PAYROLL SYSTEM $10,890 $6,000 Not Implemented