Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
371
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0829 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,700 | $4,400 | Implemented |
MA0829 # 02 Y:2022 | 02 | 2022 | INSULATE BARE EQUIPMENT | $6,782 | $8,620 | Not Implemented |
MA0829 # 04 Y:2022 | 04 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,485 | $1,000 | Not Implemented |
MA0829 # 06 Y:2022 | 06 | 2022 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $2,891 | $4,445 | Implemented |
MA0829 # 01 Y:2022 | 01 | 2022 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $34,736 | $24,400 | Not Implemented |
MA0829 # 07 Y:2022 | 07 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,594 | $5,100 | Implemented |
MA0829 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,278 | $15,850 | Not Implemented |
MA0828 # 02 Y:2022 | 02 | 2022 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $127,245 | $144,842 | Not Implemented |
MA0828 # 01 Y:2022 | 01 | 2022 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $443,207 | $3,043,367 | Not Implemented |
MA0828 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $522 | $910 | Not Implemented |
MA0828 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,386 | $12,000 | Not Implemented |
MA0828 # 03 Y:2022 | 03 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $64,198 | $280,195 | Not Implemented |
MA0828 # 04 Y:2022 | 04 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,256 | $3,515 | Not Implemented |
MA0819 # 02 Y:2020 | 02 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $28,022 | $217,000 | Implemented |
MA0819 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,721 | $2,930 | Not Implemented |
MA0819 # 01 Y:2020 | 01 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,315 | $92,400 | Not Implemented |
MA0819 # 03 Y:2020 | 03 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,833 | $1,000 | Not Implemented |
MA0801 # 03 Y:2019 | 03 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,653 | $8,930 | Not Implemented |
MA0801 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,364 | $4,110 | Not Implemented |
MA0801 # 02 Y:2019 | 02 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,204 | $200 | Not Implemented |
MA0801 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,210 | $2,397 | Not Implemented |
MA0801 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,249 | $1,250 | Not Implemented |
MA0801 # 01 Y:2019 | 01 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $416,385 | $525,000 | Not Implemented |
MA0792 # 04 Y:2018 | 04 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,744 | $3,340 | Not Implemented |
MA0792 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,711 | $9,925 | Implemented |