Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
331
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0018 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,158 | $10,000 | n/a |
CC0018 # 06 Y:2023 | 06 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $95,279 | $350,000 | n/a |
CC0018 # 05 Y:2023 | 05 | 2023 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $16,265 | $70,000 | n/a |
CC0018 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,300 | $0 | n/a |
CC0018 # 01 Y:2023 | 01 | 2023 | INSULATE FEEDWATER TANK | $2,497 | $500 | n/a |
CC0018 # 02 Y:2023 | 02 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $31,506 | $10,000 | n/a |
CC0007 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,092 | $17,800 | n/a |
CC0007 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,005 | $1,000 | n/a |
CC0007 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,936 | $4,400 | n/a |
CC0007 # 07 Y:2022 | 07 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,680 | $40,000 | n/a |
CC0007 # 08 Y:2022 | 08 | 2022 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $15,506 | $58,000 | n/a |
CC0007 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $3,056 | $8,000 | n/a |
CC0007 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,805 | $18,800 | n/a |
CC0007 # 09 Y:2022 | 09 | 2022 | REPAIR AND ELIMINATE STEAM LEAKS | $8,453 | $500 | n/a |
CC0007 # 03 Y:2022 | 03 | 2022 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $364 | $0 | n/a |
NC0665 # 01 Y:2021 | 01 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,027 | $0 | n/a |
NC0665 # 02 Y:2021 | 02 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,072 | $1,000 | n/a |
NC0665 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,642 | $2,000 | n/a |
NC0627 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,799 | $71,461 | Implemented |
NC0627 # 05 Y:2019 | 05 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,215 | $0 | Implemented |
NC0627 # 04 Y:2019 | 04 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $28,232 | $500 | Implemented |
NC0627 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,085 | $345 | Implemented |
NC0627 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $925 | $100 | Not Implemented |
NC0605 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,828 | $10,328 | Implemented |
NC0605 # 01 Y:2017 | 01 | 2017 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $23,044 | $93,000 | Not Implemented |