IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

331

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0018 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,158 $10,000 n/a
CC0018 # 06 Y:2023 06 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $95,279 $350,000 n/a
CC0018 # 05 Y:2023 05 2023 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $16,265 $70,000 n/a
CC0018 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,300 $0 n/a
CC0018 # 01 Y:2023 01 2023 INSULATE FEEDWATER TANK $2,497 $500 n/a
CC0018 # 02 Y:2023 02 2023 RECOVER WASTE HEAT FROM EQUIPMENT $31,506 $10,000 n/a
CC0007 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,092 $17,800 n/a
CC0007 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,005 $1,000 n/a
CC0007 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,936 $4,400 n/a
CC0007 # 07 Y:2022 07 2022 RECOVER WASTE HEAT FROM EQUIPMENT $10,680 $40,000 n/a
CC0007 # 08 Y:2022 08 2022 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $15,506 $58,000 n/a
CC0007 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $3,056 $8,000 n/a
CC0007 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,805 $18,800 n/a
CC0007 # 09 Y:2022 09 2022 REPAIR AND ELIMINATE STEAM LEAKS $8,453 $500 n/a
CC0007 # 03 Y:2022 03 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $364 $0 n/a
NC0665 # 01 Y:2021 01 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,027 $0 n/a
NC0665 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $1,072 $1,000 n/a
NC0665 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $5,642 $2,000 n/a
NC0627 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,799 $71,461 Implemented
NC0627 # 05 Y:2019 05 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,215 $0 Implemented
NC0627 # 04 Y:2019 04 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $28,232 $500 Implemented
NC0627 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,085 $345 Implemented
NC0627 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $925 $100 Not Implemented
NC0605 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,828 $10,328 Implemented
NC0605 # 01 Y:2017 01 2017 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $23,044 $93,000 Not Implemented