IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0645 # 03 Y:2015 03 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $93,377 $70,598 Implemented
OR0645 # 01 Y:2015 01 2015 INSULATE BARE EQUIPMENT $219,206 $131,538 Not Implemented
OR0645 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,420 $66,806 Implemented
OR0645 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,356 $73,500 Not Implemented
OR0645 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,636 $8,812 Implemented
OR0645 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $53,670 $26,776 Not Implemented
OR0514 # 02 Y:2007 02 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $135,120 $4,350 Not Implemented
OR0514 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $7,700 Implemented
OR0514 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,300 $0 Implemented
OR0514 # 03 Y:2007 03 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,900 $500 Not Implemented
OR0514 # 07 Y:2007 07 2007 UPGRADE CONTROLS ON COMPRESSORS $16,800 $11,500 Not Implemented
OR0514 # 09 Y:2007 09 2007 INSTALL TIMERS AND/OR THERMOSTATS $4,900 $7,400 Not Implemented
OR0514 # 04 Y:2007 04 2007 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $4,400 $1,000 Not Implemented
OR0514 # 05 Y:2007 05 2007 DEVELOP STANDARD OPERATING PROCEDURES $204,000 $18,800 Not Implemented
OR0514 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,700 $0 Implemented
OR0452 # 01 Y:2004 01 2004 DEVELOP STANDARD OPERATING PROCEDURES $106,000 $0 Implemented
OR0452 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,280 $7,540 Implemented
OR0452 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $2,335 $4,025 Not Implemented
OR0452 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $900 $900 Implemented
OR0452 # 05 Y:2004 05 2004 UPGRADE CONTROLS ON COMPRESSORS $3,600 $4,000 Not Implemented
OR0452 # 06 Y:2004 06 2004 USE OPTIMUM TEMPERATURE $5,420 $7,880 Implemented
OR0299 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,260 $2,500 Implemented
OR0299 # 03 Y:1997 03 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $583 $0 Implemented
OR0299 # 01 Y:1997 01 1997 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $154,770 $0 Implemented
OR0299 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $580 $1,500 Implemented