Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
279
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0585 # 05 Y:2005 | 05 | 2005 | USE MINIMUM STEAM OPERATING PRESSURE | $29,239 | $23,014 | Implemented |
MA0585 # 08 Y:2005 | 08 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,385 | $5,300 | Implemented |
MA0585 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,480 | $78,770 | Implemented |
MA0585 # 09 Y:2005 | 09 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,037 | $5,300 | Implemented |
MA0585 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $73,100 | $37,300 | Implemented |
MA0585 # 07 Y:2005 | 07 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,353 | $9,225 | Implemented |
MA0585 # 01 Y:2005 | 01 | 2005 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $112,569 | $254,000 | Not Implemented |
MA0585 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $54,416 | $37,300 | Implemented |
MA0585 # 02 Y:2005 | 02 | 2005 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $91,755 | $254,400 | Not Implemented |
TA0108 # 05 Y:2005 | 05 | 2005 | USE MINIMUM SAFE OVEN VENTILATION | $300 | $0 | Not Implemented |
TA0108 # 04 Y:2005 | 04 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,590 | $0 | Implemented |
TA0108 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,530 | $11,050 | Implemented |
TA0108 # 02 Y:2005 | 02 | 2005 | INSULATE BARE EQUIPMENT | $2,910 | $495 | Implemented |
TA0108 # 01 Y:2005 | 01 | 2005 | OPTIMIZE PLANT POWER FACTOR | $11,100 | $22,000 | Not Implemented |
TA0108 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,647 | $120 | Implemented |
UM0290 # 01 Y:2005 | 01 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $7,943 | $12,500 | Not Implemented |
UM0290 # 07 Y:2005 | 07 | 2005 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $365 | $720 | Implemented |
UM0290 # 05 Y:2005 | 05 | 2005 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,242 | $0 | Not Implemented |
UM0290 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,268 | $11,077 | Implemented |
UM0290 # 04 Y:2005 | 04 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,753 | $6,230 | Implemented |
UM0290 # 03 Y:2005 | 03 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,868 | $2,650 | Implemented |
UM0290 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,296 | $1,950 | Implemented |
AS0409 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,404 | $11,000 | Not Implemented |
AS0409 # 02 Y:2005 | 02 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $13,305 | $10,000 | Not Implemented |
AS0409 # 03 Y:2005 | 03 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $7,055 | $8,000 | Not Implemented |