Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
142
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0376 # 06 Y:2010 | 06 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,590 | $5,500 | Implemented |
BD0376 # 05 Y:2010 | 05 | 2010 | INSTALL TURBULATORS | $20,378 | $4,350 | Not Implemented |
BD0376 # 04 Y:2010 | 04 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $39,238 | $34,000 | Implemented |
BD0376 # 03 Y:2010 | 03 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $62,913 | $70,000 | Implemented |
BD0376 # 02 Y:2010 | 02 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $67,200 | $125 | Not Implemented |
BD0376 # 01 Y:2010 | 01 | 2010 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $105,011 | $51,500 | Implemented |
BD0376 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $989 | $1,727 | Implemented |
BD0376 # 07 Y:2010 | 07 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $7,210 | $9,000 | Not Implemented |
SD0430 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,949 | $800 | Implemented |
SD0430 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,250 | $1,671 | Not Implemented |
SD0430 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $1,126 | $1,029 | Not Implemented |
SD0430 # 01 Y:2010 | 01 | 2010 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $264 | $0 | Not Implemented |
SD0430 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,152 | $100 | Not Implemented |
OK0797 # 08 Y:2010 | 08 | 2010 | INSTALL SET-BACK TIMERS | $3,991 | $3,994 | Not Implemented |
OK0797 # 11 Y:2010 | 11 | 2010 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $51,080 | $1,032,424 | Implemented |
OK0797 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,987 | $1,500 | Implemented |
OK0797 # 02 Y:2010 | 02 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,606 | $402 | Not Implemented |
OK0797 # 09 Y:2010 | 09 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $856 | $5,934 | Not Implemented |
OK0797 # 10 Y:2010 | 10 | 2010 | INSTALL REPLACEMENT DOORS | $597 | $3,114 | Implemented |
OK0797 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $718 | $1,654 | Not Implemented |
OK0797 # 01 Y:2010 | 01 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $340 | $236 | Not Implemented |
OK0797 # 06 Y:2010 | 06 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $583 | $2,539 | Not Implemented |
OK0797 # 07 Y:2010 | 07 | 2010 | INSTALL SET-BACK TIMERS | $14,118 | $5,326 | Not Implemented |
OK0797 # 05 Y:2010 | 05 | 2010 | INSTALL OCCUPANCY SENSORS | $260 | $0 | Implemented |
IC0176 # 01 Y:2010 | 01 | 2010 | INSTALL OCCUPANCY SENSORS | $317 | $1,315 | Not Implemented |