Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,411
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0376 # 07 Y:2010 | 07 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $7,210 | $9,000 | Not Implemented |
BD0376 # 04 Y:2010 | 04 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $39,238 | $34,000 | Implemented |
BD0376 # 03 Y:2010 | 03 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $62,913 | $70,000 | Implemented |
BD0376 # 05 Y:2010 | 05 | 2010 | INSTALL TURBULATORS | $20,378 | $4,350 | Not Implemented |
BD0376 # 02 Y:2010 | 02 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $67,200 | $125 | Not Implemented |
BD0376 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $989 | $1,727 | Implemented |
BD0376 # 06 Y:2010 | 06 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,590 | $5,500 | Implemented |
BD0376 # 01 Y:2010 | 01 | 2010 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $105,011 | $51,500 | Implemented |
SD0430 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,152 | $100 | Not Implemented |
SD0430 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,250 | $1,671 | Not Implemented |
SD0430 # 01 Y:2010 | 01 | 2010 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $264 | $0 | Not Implemented |
SD0430 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,949 | $800 | Implemented |
SD0430 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $1,126 | $1,029 | Not Implemented |
OK0797 # 09 Y:2010 | 09 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $856 | $5,934 | Not Implemented |
OK0797 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,987 | $1,500 | Implemented |
OK0797 # 02 Y:2010 | 02 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,606 | $402 | Not Implemented |
OK0797 # 11 Y:2010 | 11 | 2010 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $51,080 | $1,032,424 | Implemented |
OK0797 # 07 Y:2010 | 07 | 2010 | INSTALL SET-BACK TIMERS | $14,118 | $5,326 | Not Implemented |
OK0797 # 06 Y:2010 | 06 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $583 | $2,539 | Not Implemented |
OK0797 # 10 Y:2010 | 10 | 2010 | INSTALL REPLACEMENT DOORS | $597 | $3,114 | Implemented |
OK0797 # 08 Y:2010 | 08 | 2010 | INSTALL SET-BACK TIMERS | $3,991 | $3,994 | Not Implemented |
OK0797 # 01 Y:2010 | 01 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $340 | $236 | Not Implemented |
OK0797 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $718 | $1,654 | Not Implemented |
OK0797 # 05 Y:2010 | 05 | 2010 | INSTALL OCCUPANCY SENSORS | $260 | $0 | Implemented |
IC0176 # 05 Y:2010 | 05 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $858 | $0 | Not Implemented |