Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
763
matching recommendationsSIC | 262 | Paper Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0894 # 01 Y:2013 | 01 | 2013 | USE MINIMUM COOLING WATER TO BEARINGS | $17,378 | $0 | Not Implemented |
UD0894 # 02 Y:2013 | 02 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,885 | $0 | Implemented |
UD0894 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,290 | $0 | Implemented |
UD0894 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $17,944 | $8,000 | Not Implemented |
UD0894 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,638 | $10,000 | Not Implemented |
UD0894 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,426 | $0 | Not Implemented |
UD0894 # 07 Y:2013 | 07 | 2013 | INSULATE BARE EQUIPMENT | $142 | $350 | Implemented |
UD0894 # 08 Y:2013 | 08 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $12,240 | $30,550 | Not Implemented |
UD0894 # 09 Y:2013 | 09 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $10,400 | $40,600 | Not Implemented |
OR0615 # 01 Y:2013 | 01 | 2013 | ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING | $24,283 | $1,000 | Implemented |
OR0615 # 02 Y:2013 | 02 | 2013 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $48,896 | $68,866 | Implemented |
OR0615 # 03 Y:2013 | 03 | 2013 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $791,616 | $300,000 | Not Implemented |
OR0615 # 04 Y:2013 | 04 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,731 | $17,127 | Implemented |
OR0615 # 05 Y:2013 | 05 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $14,352 | $36,600 | Not Implemented |
OR0615 # 06 Y:2013 | 06 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,601 | $4,986 | Implemented |
IP0018 # 01 Y:2013 | 01 | 2013 | APPLY FOR INVESTMENT INCENTIVES | $42,227 | $0 | Not Implemented |
IP0018 # 02 Y:2013 | 02 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $109,212 | $0 | Implemented |
IP0018 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,467 | $430 | Not Implemented |
IP0018 # 04 Y:2013 | 04 | 2013 | INSTALL OCCUPANCY SENSORS | $734 | $100 | Not Implemented |
IP0018 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,545 | $1,400 | Implemented |
IP0018 # 06 Y:2013 | 06 | 2013 | INSULATE BARE EQUIPMENT | $5,669 | $2,019 | Not Implemented |
IP0018 # 07 Y:2013 | 07 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $99,761 | $59,384 | Implemented |
MA0710 # 01 Y:2013 | 01 | 2013 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $132,553 | $324,000 | Not Implemented |
MA0710 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,966 | $10,580 | Implemented |
MA0710 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,915 | $10,580 | Implemented |