Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
559
matching recommendationsSIC | 262 | Paper Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0333 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,348 | $4,720 | Not Implemented |
LL0333 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $611 | $4,655 | Not Implemented |
LL0333 # 05 Y:2010 | 05 | 2010 | INSULATE BARE EQUIPMENT | $3,966 | $5,315 | Implemented |
LL0333 # 02 Y:2010 | 02 | 2010 | REPAIR AND ELIMINATE STEAM LEAKS | $288,465 | $36,500 | Implemented |
LL0333 # 01 Y:2010 | 01 | 2010 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,585,020 | $273,500 | Implemented |
LL0333 # 04 Y:2010 | 04 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,177 | $540 | Not Implemented |
LL0333 # 07 Y:2010 | 07 | 2010 | INSTALL OCCUPANCY SENSORS | $432 | $1,020 | Not Implemented |
LL0333 # 08 Y:2010 | 08 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $363 | $668 | Not Implemented |
SU0297 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,458 | $697 | Implemented |
SU0297 # 08 Y:2010 | 08 | 2010 | OPTIMIZE PLANT POWER FACTOR | $18,693 | $24,129 | Implemented |
SU0297 # 05 Y:2010 | 05 | 2010 | REPAIR OR REPLACE STEAM TRAPS | $29,835 | $5,275 | Implemented |
SU0297 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $30,345 | $0 | Implemented |
SU0297 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,260 | $650 | Implemented |
SU0297 # 09 Y:2010 | 09 | 2010 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $314,524 | $658,300 | Not Implemented |
SU0297 # 02 Y:2010 | 02 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,367 | $0 | Not Implemented |
SU0297 # 10 Y:2010 | 10 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,058 | $45,795 | Implemented |
SU0297 # 07 Y:2010 | 07 | 2010 | INSTALL OCCUPANCY SENSORS | $5,273 | $2,136 | Not Implemented |
SU0297 # 11 Y:2010 | 11 | 2010 | UPGRADE OBSOLETE EQUIPMENT | $1,054 | $4,725 | Implemented |
SU0297 # 04 Y:2010 | 04 | 2010 | USE PHOTOCELL CONTROLS | $1,997 | $209 | Not Implemented |
MI0188 # 09 Y:2010 | 09 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,341 | $1,800 | Implemented |
MI0188 # 04 Y:2010 | 04 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $38,905 | $0 | Not Implemented |
MI0188 # 10 Y:2010 | 10 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,536 | $1,500 | Implemented |
MI0188 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,420 | $920 | Implemented |
MI0188 # 02 Y:2010 | 02 | 2010 | USE POWER DURING OFF-PEAK PERIODS | $45,276 | $2,000 | Not Implemented |
MI0188 # 06 Y:2010 | 06 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,600 | $1,920 | Implemented |