Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 2621 | Paper Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0894 # 07 Y:2013 | 07 | 2013 | INSULATE BARE EQUIPMENT | $142 | $350 | Implemented |
UD0894 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $17,944 | $8,000 | Not Implemented |
UD0894 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,290 | $0 | Implemented |
UD0894 # 02 Y:2013 | 02 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,885 | $0 | Implemented |
UD0894 # 01 Y:2013 | 01 | 2013 | USE MINIMUM COOLING WATER TO BEARINGS | $17,378 | $0 | Not Implemented |
UD0894 # 08 Y:2013 | 08 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $12,240 | $30,550 | Not Implemented |
UD0894 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,426 | $0 | Not Implemented |
UD0894 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,638 | $10,000 | Not Implemented |
UD0894 # 09 Y:2013 | 09 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $10,400 | $40,600 | Not Implemented |
UD0539 # 04 Y:1998 | 04 | 1998 | INCREASE AMOUNT OF CONDENSATE RETURNED | $8,880 | $15,000 | Implemented |
UD0539 # 03 Y:1998 | 03 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $39,482 | $0 | Not Implemented |
UD0539 # 02 Y:1998 | 02 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,296 | $0 | Implemented |
UD0539 # 01 Y:1998 | 01 | 1998 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,210 | $3,000 | Implemented |
UD0502 # 04 Y:1996 | 04 | 1996 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $19,538 | $500 | Implemented |
UD0502 # 05 Y:1996 | 05 | 1996 | USE LESS WASTEFUL PACKAGING | $48,400 | $0 | Implemented |
UD0502 # 03 Y:1996 | 03 | 1996 | MINIMIZE WATER USAGE | $48,400 | $150 | Not Implemented |
UD0502 # 02 Y:1996 | 02 | 1996 | OPTIMIZE PLANT POWER FACTOR | $29,345 | $93,000 | Implemented |
UD0502 # 01 Y:1996 | 01 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $372,300 | $800,000 | Implemented |
UD0500 # 04 Y:1996 | 04 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,011 | $1,380 | Implemented |
UD0500 # 10 Y:1996 | 10 | 1996 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $29,297 | $0 | Implemented |
UD0500 # 09 Y:1996 | 09 | 1996 | INSULATE BARE EQUIPMENT | $628 | $2,040 | Implemented |
UD0500 # 08 Y:1996 | 08 | 1996 | USE MINIMUM STEAM OPERATING PRESSURE | $4,188 | $0 | Implemented |
UD0500 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,461 | $3,112 | Implemented |
UD0500 # 07 Y:1996 | 07 | 1996 | METER WASTE WATER | $30,899 | $1,000 | Implemented |
UD0500 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,228 | $3,710 | Implemented |