IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 2621 Paper Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0894 # 07 Y:2013 07 2013 INSULATE BARE EQUIPMENT $142 $350 Implemented
UD0894 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $17,944 $8,000 Not Implemented
UD0894 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,290 $0 Implemented
UD0894 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,885 $0 Implemented
UD0894 # 01 Y:2013 01 2013 USE MINIMUM COOLING WATER TO BEARINGS $17,378 $0 Not Implemented
UD0894 # 08 Y:2013 08 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $12,240 $30,550 Not Implemented
UD0894 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,426 $0 Not Implemented
UD0894 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,638 $10,000 Not Implemented
UD0894 # 09 Y:2013 09 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $10,400 $40,600 Not Implemented
UD0539 # 04 Y:1998 04 1998 INCREASE AMOUNT OF CONDENSATE RETURNED $8,880 $15,000 Implemented
UD0539 # 03 Y:1998 03 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $39,482 $0 Not Implemented
UD0539 # 02 Y:1998 02 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,296 $0 Implemented
UD0539 # 01 Y:1998 01 1998 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,210 $3,000 Implemented
UD0502 # 04 Y:1996 04 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $19,538 $500 Implemented
UD0502 # 05 Y:1996 05 1996 USE LESS WASTEFUL PACKAGING $48,400 $0 Implemented
UD0502 # 03 Y:1996 03 1996 MINIMIZE WATER USAGE $48,400 $150 Not Implemented
UD0502 # 02 Y:1996 02 1996 OPTIMIZE PLANT POWER FACTOR $29,345 $93,000 Implemented
UD0502 # 01 Y:1996 01 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $372,300 $800,000 Implemented
UD0500 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,011 $1,380 Implemented
UD0500 # 10 Y:1996 10 1996 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $29,297 $0 Implemented
UD0500 # 09 Y:1996 09 1996 INSULATE BARE EQUIPMENT $628 $2,040 Implemented
UD0500 # 08 Y:1996 08 1996 USE MINIMUM STEAM OPERATING PRESSURE $4,188 $0 Implemented
UD0500 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,461 $3,112 Implemented
UD0500 # 07 Y:1996 07 1996 METER WASTE WATER $30,899 $1,000 Implemented
UD0500 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,228 $3,710 Implemented