IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 2621 Paper Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0333 # 02 Y:2010 02 2010 REPAIR AND ELIMINATE STEAM LEAKS $288,465 $36,500 Implemented
LL0333 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,348 $4,720 Not Implemented
LL0333 # 04 Y:2010 04 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,177 $540 Not Implemented
LL0333 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $3,966 $5,315 Implemented
LL0333 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $611 $4,655 Not Implemented
LL0333 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $432 $1,020 Not Implemented
LL0333 # 08 Y:2010 08 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $363 $668 Not Implemented
LL0333 # 01 Y:2010 01 2010 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,585,020 $273,500 Implemented
SU0297 # 02 Y:2010 02 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,367 $0 Not Implemented
SU0297 # 11 Y:2010 11 2010 UPGRADE OBSOLETE EQUIPMENT $1,054 $4,725 Implemented
SU0297 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,458 $697 Implemented
SU0297 # 04 Y:2010 04 2010 USE PHOTOCELL CONTROLS $1,997 $209 Not Implemented
SU0297 # 05 Y:2010 05 2010 REPAIR OR REPLACE STEAM TRAPS $29,835 $5,275 Implemented
SU0297 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,260 $650 Implemented
SU0297 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $5,273 $2,136 Not Implemented
SU0297 # 08 Y:2010 08 2010 OPTIMIZE PLANT POWER FACTOR $18,693 $24,129 Implemented
SU0297 # 09 Y:2010 09 2010 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $314,524 $658,300 Not Implemented
SU0297 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,058 $45,795 Implemented
SU0297 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,345 $0 Implemented
MI0188 # 10 Y:2010 10 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,536 $1,500 Implemented
MI0188 # 09 Y:2010 09 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $2,341 $1,800 Implemented
MI0188 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $3,050 $2,904 Implemented
MI0188 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,952 $3,680 Not Implemented
MI0188 # 06 Y:2010 06 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,600 $1,920 Implemented
MI0188 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,420 $920 Implemented