Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
380
matching recommendationsSIC | 2631 | Paperboard Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0029 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,179 | $5,609 | n/a |
NT0029 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,227 | $1,819 | n/a |
NT0029 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $34,386 | $117,351 | n/a |
NT0029 # 04 Y:2024 | 04 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $204,971 | $10,000 | n/a |
NT0029 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,550 | $21,900 | n/a |
UW2304 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $231 | $332 | Not Implemented |
UW2304 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $28,885 | $0 | Implemented |
UW2304 # 02 Y:2023 | 02 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,854 | $372 | Implemented |
UW2304 # 03 Y:2023 | 03 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $148,199 | $381,066 | Implemented |
UW2304 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $848 | $937 | Implemented |
IP0145 # 02 Y:2021 | 02 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $24,768 | $21,741 | Not Implemented |
IP0145 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,236 | $12,797 | Not Implemented |
IP0145 # 04 Y:2021 | 04 | 2021 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $213,186 | $665,875 | Not Implemented |
IP0145 # 01 Y:2021 | 01 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $88,444 | $27,000 | Not Implemented |
IP0145 # 05 Y:2021 | 05 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,611 | $17,283 | Not Implemented |
AM0787 # 05 Y:2019 | 05 | 2019 | OPTIMIZE PLANT POWER FACTOR | $70,814 | $178,864 | Implemented |
AM0787 # 08 Y:2019 | 08 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $399 | $280 | Not Implemented |
AM0787 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,577 | $2,640 | Implemented |
AM0787 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,322 | $825 | Implemented |
AM0787 # 04 Y:2019 | 04 | 2019 | USE SYNTHETIC LUBRICANT | $13,271 | $14,560 | Implemented |
AM0787 # 03 Y:2019 | 03 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $56,595 | $10,440 | Implemented |
AM0787 # 02 Y:2019 | 02 | 2019 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $312,044 | $849,614 | Not Implemented |
AM0787 # 01 Y:2019 | 01 | 2019 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $290,927 | $1,011,274 | Not Implemented |
OK0986 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $552 | $1,402 | Implemented |
OK0986 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $893 | $6,038 | Implemented |