IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,617

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0161 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,398 $10,864 Implemented
UD0161 # 04 Y:1985 04 1985 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $861 $1,000 Implemented
UD0161 # 06 Y:1985 06 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $8,671 $2,100 Implemented
UD0161 # 07 Y:1985 07 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $23,960 $48,000 Implemented
UD0164 # 01 Y:1985 01 1985 REDUCE FLUID FLOW RATES $513 $150 Implemented
UD0164 # 02 Y:1985 02 1985 INSTALL STORM WINDOWS AND DOORS $1,368 $1,226 Implemented
UD0164 # 03 Y:1985 03 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,756 $25,000 Implemented
KU0158 # 02 Y:1985 02 1985 INSTALL TIMERS AND/OR THERMOSTATS $12,363 $1,500 Implemented
KU0158 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,601 $5,238 Implemented
KU0158 # 04 Y:1985 04 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,810 $4,900 Implemented
KU0158 # 06 Y:1985 06 1985 REDUCE VENTILATION AIR $4,801 $2,500 Implemented
KU0158 # 08 Y:1985 08 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $2,391 $2,165 Implemented
KU0158 # 09 Y:1985 09 1985 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,667 $2,000 Implemented
KU0158 # 10 Y:1985 10 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $2,572 $500 Implemented
KU0158 # 12 Y:1985 12 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,160 $0 Implemented
KU0158 # 13 Y:1985 13 1985 INSTALL AUTOMATIC STACK DAMPER $903 $1,600 Implemented
KU0157 # 02 Y:1985 02 1985 IMPROVE LUBRICATION PRACTICES $1,569 $290 Implemented
KU0157 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,260 $4,000 Implemented
KU0157 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,889 $1,550 Implemented
KU0157 # 05 Y:1985 05 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $759 $1,016 Implemented
KU0157 # 06 Y:1985 06 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,893 $1,500 Implemented
KU0157 # 07 Y:1985 07 1985 RECOVER WASTE HEAT FROM EQUIPMENT $899 $1,480 Implemented
KU0157 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $357 $0 Implemented
KU0157 # 09 Y:1985 09 1985 INSTALL AUTOMATIC STACK DAMPER $745 $1,100 Implemented
GT0236 # 01 Y:1984 01 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $49 $0 Implemented