IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,617

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0303 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,131 $15 Implemented
LE0303 # 11 Y:2010 11 2010 RECOVER WASTE HEAT FROM EQUIPMENT $973 $1,000 Implemented
SF0375 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $75,147 $244,092 Implemented
SF0375 # 02 Y:2009 02 2009 INSULATE BARE EQUIPMENT $2,383 $460 Implemented
SF0375 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,246 $0 Implemented
SF0375 # 10 Y:2009 10 2009 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $9,983 $67,481 Implemented
SF0375 # 09 Y:2009 09 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,842 $12,018 Implemented
SF0375 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $10,418 $41,832 Implemented
UA0037 # 03 Y:2009 03 2009 REPAIR AND ELIMINATE STEAM LEAKS $60,900 $1,744 Implemented
UA0037 # 04 Y:2009 04 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $25,667 $3,523 Implemented
UA0037 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,336 $0 Implemented
UA0037 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,571 $2,500 Implemented
UA0037 # 08 Y:2009 08 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $58,174 $32,445 Implemented
UA0037 # 09 Y:2009 09 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,938 $6,000 Implemented
UA0037 # 10 Y:2009 10 2009 SHUT OFF PILOTS IN STANDBY EQUIPMENT $836 $0 Implemented
UA0037 # 12 Y:2009 12 2009 INSTALL TIMERS AND/OR THERMOSTATS $16,135 $1,700 Implemented
UW0027 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,168 $2,280 Implemented
UW0027 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $0 Implemented
TT0031 # 01 Y:2009 01 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $852 $850 Implemented
TT0031 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,178 $480 Implemented
TT0031 # 03 Y:2009 03 2009 USE PHOTOCELL CONTROLS $23,587 $55,000 Implemented
SF0368 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,195 $0 Implemented
SF0368 # 08 Y:2008 08 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,812 $56,073 Implemented
UD0787 # 10 Y:2008 10 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $388 $1,000 Implemented
UD0787 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,242 $107,122 Implemented