IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0309 # 04 Y:2003 04 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,235 $4,150 Not Implemented
IA0309 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $278 $1,166 Not Implemented
IA0309 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $0 Not Implemented
IA0309 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $506 $798 Not Implemented
IA0309 # 08 Y:2003 08 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $758 $1,900 Implemented
IA0309 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $121 $51 Not Implemented
IA0309 # 09 Y:2003 09 2003 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $6,386 $14,000 Not Implemented
IA0309 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $518 $13 Implemented
IA0309 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,309 $456 Implemented
IA0309 # 10 Y:2003 10 2003 APPLY FOR INVESTMENT INCENTIVES $1,191 $250 Not Implemented
IA0272 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $612 $60 Implemented
IA0272 # 09 Y:2001 09 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,544 $445 Implemented
IA0272 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $1,313 $1,862 Implemented
IA0272 # 10 Y:2001 10 2001 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,127 $254 Not Implemented
IA0272 # 08 Y:2001 08 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $337 $740 Not Implemented
IA0272 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,186 $209 Not Implemented
IA0272 # 11 Y:2001 11 2001 MINIMIZE WATER USAGE $1,414 $35 Implemented
IA0272 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,710 $356 Implemented
IA0272 # 01 Y:2001 01 2001 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $25,513 $8,420 Not Implemented
IA0272 # 12 Y:2001 12 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $37,440 $30,000 n/a
IA0272 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,418 $8,938 Not Implemented
IA0272 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,142 $1,126 Not Implemented
IA0215 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,169 $382 Implemented
IA0215 # 02 Y:1999 02 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,587 $2,500 Implemented
IA0215 # 08 Y:1999 08 1999 INSTALL OCCUPANCY SENSORS $294 $1,264 Implemented