IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0482 # 03 Y:2001 03 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,590 $30,000 Not Implemented
MA0482 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,900 $23,000 Not Implemented
MA0482 # 05 Y:2001 05 2001 USE RADIANT HEATER FOR SPOT HEATING $5,430 $25,000 Not Implemented
MA0482 # 06 Y:2001 06 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,200 $13,000 Not Implemented
MA0482 # 07 Y:2001 07 2001 RECYCLE WHITE WATER $5,000 $20,000 Not Implemented
MA0482 # 08 Y:2001 08 2001 METER WASTE WATER $4,400 $12,000 Not Implemented
MA0482 # 09 Y:2001 09 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,040 $450 Implemented
MA0482 # 10 Y:2001 10 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,700 $5,000 Not Implemented
MA0482 # 11 Y:2001 11 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,500 $7,000 Not Implemented
MA0482 # 12 Y:2001 12 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,000 $600 Not Implemented
MA0465 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $4,076 $4,125 Implemented
MA0465 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,682 $20,325 Not Implemented
MA0465 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $845 $528 Implemented
MA0465 # 05 Y:2000 05 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $605 $400 Implemented
MA0465 # 01 Y:2000 01 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $34,550 $50,000 Not Implemented
MA0399 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $667 $75 Implemented
MA0378 # 05 Y:1996 05 1996 USE MAGNETIC TECHNOLOGY TO TREAT WATER $3,300 $9,235 Not Implemented
MA0378 # 04 Y:1996 04 1996 USE RADIANT HEATER FOR SPOT HEATING $2,379 $3,200 Not Implemented
MA0378 # 03 Y:1996 03 1996 RECOVER WASTE HEAT FROM EQUIPMENT $1,699 $1,415 Not Implemented
MA0378 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $413 $272 Not Implemented
MA0378 # 01 Y:1996 01 1996 INSULATE BARE EQUIPMENT $6,197 $3,178 Not Implemented
MA0206 # 05 Y:1991 05 1991 TURN OFF EQUIPMENT WHEN NOT IN USE $742 $0 Implemented
MA0206 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $864 $473 Implemented
MA0206 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $498 $145 Implemented
MA0206 # 02 Y:1991 02 1991 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $10,773 $45,415 Implemented