Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,546

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0590 # 09 Y:2006 09 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $3,850 $32,600 Not Implemented
CO0590 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $1,280 $680 Implemented
CO0590 # 11 Y:2006 11 2006 INSTALL OCCUPANCY SENSORS $210 $780 Not Implemented
CO0590 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $160 $500 Implemented
SU0239 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,600 $0 Implemented
SU0239 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,502 $0 Not Implemented
SU0239 # 03 Y:2006 03 2006 $1,365 $0 Implemented
SU0239 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,985 $440 Implemented
SU0239 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,248 $371 Implemented
SU0239 # 06 Y:2006 06 2006 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $84 $51 Implemented
SU0239 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,577 $5,660 Implemented
SU0239 # 08 Y:2006 08 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $166 $270 Not Implemented
SU0239 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $223 $487 Implemented
SU0239 # 10 Y:2006 10 2006 OPTIMIZE PLANT POWER FACTOR $1,820 $6,664 Not Implemented
UU0099 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,650 $0 Implemented
UU0099 # 02 Y:2006 02 2006 ISOLATE HOT OR COLD EQUIPMENT $1,350 $0 Not Implemented
UU0099 # 03 Y:2006 03 2006 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $36,960 $164,490 Not Implemented
UU0099 # 04 Y:2006 04 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,029 $7,500 Not Implemented
UU0099 # 05 Y:2006 05 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,100 $21,000 Not Implemented
UU0099 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,230 $2,510 Implemented
UU0099 # 07 Y:2006 07 2006 OPTIMIZE PLANT POWER FACTOR $8,020 $14,000 Not Implemented
WI0511 # 01 Y:2006 01 2006 $10,890 $6,000 Not Implemented
WI0511 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $8,256 $850 Implemented
WI0511 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,167 $8,820 Implemented
WI0511 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,712 $0 Implemented