Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,551

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0217 # 08 Y:2005 08 2005 OPTIMIZE PLANT POWER FACTOR $3,979 $14,487 Implemented
MI0114 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $28,126 $1,091 Not Implemented
MI0114 # 02 Y:2005 02 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $20,574 $30,050 Implemented
MI0114 # 03 Y:2005 03 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,927 $27,000 Not Implemented
MI0114 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $2,983 $225 Implemented
MI0114 # 05 Y:2005 05 2005 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $9,790 $4,360 Implemented
MI0114 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $9,392 $77 Implemented
MI0114 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,896 $1,074 Implemented
MI0114 # 08 Y:2005 08 2005 UPGRADE CONTROLS ON COMPRESSORS $3,882 $0 Implemented
MI0114 # 09 Y:2005 09 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,521 $4,628 Not Implemented
IC0102 # 01 Y:2005 01 2005 MOVE BOILER TO MORE EFFICIENT LOCATION $39,466 $3,500 Not Implemented
IC0102 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,439 $54,000 Not Implemented
IC0102 # 03 Y:2005 03 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $9,426 $6,213 Not Implemented
IC0102 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,597 $0 Not Implemented
IC0102 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $16,902 $2,200 Not Implemented
IC0102 # 06 Y:2005 06 2005 INCREASE AMOUNT OF CONDENSATE RETURNED $1,738 $1,200 Not Implemented
IC0102 # 07 Y:2005 07 2005 INSTALL STEAM TRAP $542 $2,142 Not Implemented
IC0102 # 08 Y:2005 08 2005 CLOSE OFF UNNEEDED STEAM LINES $329 $384 Not Implemented
IC0102 # 09 Y:2005 09 2005 KEEP BOILER TUBES CLEAN $3,862 $776 Not Implemented
IC0102 # 10 Y:2005 10 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,250 $52,000 Not Implemented
IC0102 # 11 Y:2005 11 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $10,135 $10,152 Not Implemented
IC0102 # 12 Y:2005 12 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,208 $5,000 Not Implemented
IC0102 # 13 Y:2005 13 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,019 $220 Not Implemented
IC0102 # 14 Y:2005 14 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,924 $2,500 Not Implemented
IC0102 # 15 Y:2005 15 2005 UPGRADE CONTROLS ON COMPRESSORS $669 $168 Not Implemented