Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,551
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0102 # 16 Y:2005 | 16 | 2005 | DISCONNECT BALLASTS | $29,539 | $2,208 | Not Implemented |
TA0096 # 01 Y:2005 | 01 | 2005 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $13,200 | $25,840 | Not Implemented |
TA0096 # 02 Y:2005 | 02 | 2005 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $12,700 | $5,330 | Not Implemented |
TA0096 # 03 Y:2005 | 03 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,500 | $2,340 | Not Implemented |
TA0096 # 04 Y:2005 | 04 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,870 | $13,400 | Not Implemented |
TA0096 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,525 | $7,400 | Not Implemented |
TA0096 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,040 | $500 | Implemented |
TA0096 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $890 | $0 | Not Implemented |
TA0096 # 08 Y:2005 | 08 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $645 | $0 | Not Implemented |
TA0096 # 09 Y:2005 | 09 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $175 | $0 | Not Implemented |
AM0487 # 01 Y:2005 | 01 | 2005 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $108,000 | $24,500 | Not Implemented |
AM0487 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $27,000 | $61,600 | Not Implemented |
AM0487 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,460 | $500 | Not Implemented |
AM0487 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $10,400 | $1,200 | Not Implemented |
AM0487 # 05 Y:2005 | 05 | 2005 | USE PHOTOCELL CONTROLS | $2,600 | $100 | Not Implemented |
AM0487 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,700 | $2,100 | Not Implemented |
AM0487 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $920 | $500 | Not Implemented |
AM0487 # 08 Y:2005 | 08 | 2005 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,940 | $4,200 | Not Implemented |
UU0083 # 01 Y:2005 | 01 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,340 | $2,000 | Not Implemented |
UU0083 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $760 | $3,900 | Not Implemented |
UU0083 # 03 Y:2005 | 03 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,880 | $21,000 | Not Implemented |
UU0083 # 04 Y:2005 | 04 | 2005 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $5,640 | $0 | Not Implemented |
UU0083 # 05 Y:2005 | 05 | 2005 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $36,670 | $87,400 | Not Implemented |
LM0094 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,130 | $500 | Implemented |
LM0094 # 02 Y:2005 | 02 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,502 | $983 | Implemented |