IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,551

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0485 # 07 Y:2005 07 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $390 $800 Not Implemented
WI0485 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $354 $840 Not Implemented
NC0308 # 01 Y:2005 01 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,359 $20,313 Implemented
NC0308 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $6,017 $2,450 Implemented
NC0308 # 03 Y:2005 03 2005 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $15,600 $1,000 Not Implemented
NC0308 # 04 Y:2005 04 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $13,767 $6,500 Implemented
NC0308 # 05 Y:2005 05 2005 ADOPT IN-HOUSE MATERIAL GENERATION $3,600 $4,000 Not Implemented
NC0308 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $1,493 $2,000 Implemented
NC0308 # 07 Y:2005 07 2005 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $867 $750 Implemented
NC0308 # 08 Y:2005 08 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $338 $160 Implemented
AS0392 # 01 Y:2005 01 2005 MODIFY CURRENT INCENTIVE PROGRAM $1,000,000 $891,000 Not Implemented
AS0392 # 02 Y:2005 02 2005 USE PLASTIC PALLETS INSTEAD OF WOOD $1,000,000 $217,560 Not Implemented
AS0392 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,212 $16,893 Not Implemented
AS0392 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,774 $4,055 Not Implemented
AS0392 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $2,942 $650 Not Implemented
AS0392 # 06 Y:2005 06 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $773 $700 Not Implemented
AS0392 # 07 Y:2005 07 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,689 $6,000 Not Implemented
AS0391 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $71,356 $27,044 Not Implemented
AS0391 # 02 Y:2005 02 2005 UPGRADE CONTROLS ON COMPRESSORS $56,937 $10,000 Not Implemented
AS0391 # 03 Y:2005 03 2005 DEVELOP STANDARD OPERATING PROCEDURES $121,316 $80,000 Not Implemented
AS0391 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,082 $14,973 Not Implemented
AS0391 # 05 Y:2005 05 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,058 $5,000 Not Implemented
AS0391 # 06 Y:2005 06 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $14,162 $625 Not Implemented
AS0391 # 07 Y:2005 07 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,974 $2,667 Not Implemented
AS0391 # 08 Y:2005 08 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,299 $3,287 Not Implemented