IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

281

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0368 # 09 Y:2008 09 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $88,956 $1,020,250 Not Implemented
SF0368 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $666 $584 Not Implemented
SD0406 # 05 Y:2008 05 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,294 $1,477 Implemented
SD0406 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,339 $6,365 Implemented
SD0406 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,830 $3,110 Implemented
SD0406 # 02 Y:2008 02 2008 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,257 $1,026 Not Implemented
SD0406 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,805 $48,176 Implemented
LM0094 # 05 Y:2005 05 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,628 $0 Not Implemented
LM0094 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,187 $34,080 Not Implemented
LM0094 # 03 Y:2005 03 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $57,780 $50,000 Implemented
LM0094 # 02 Y:2005 02 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $2,502 $983 Implemented
LM0094 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,130 $500 Implemented
SD0356 # 07 Y:2005 07 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,230 $18,500 Not Implemented
SD0356 # 01 Y:2005 01 2005 UPGRADE CONTROLS ON COMPRESSORS $5,391 $11,000 Implemented
SD0356 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,992 $14,000 Implemented
SD0356 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,583 $7,647 Not Implemented
SD0356 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,351 $120 Implemented
SD0356 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,151 $0 Not Implemented
SD0356 # 06 Y:2005 06 2005 USE EVAPORATION TO CONCENTRATE MATERIAL $18,769 $25,650 Not Implemented
SD0332 # 04 Y:2004 04 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,750 $6,000 Not Implemented
SD0332 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,765 $900 Implemented
SD0332 # 05 Y:2004 05 2004 INSTALL SKYLIGHTS $3,460 $7,015 Not Implemented
SD0332 # 01 Y:2004 01 2004 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $164,104 $609,600 Not Implemented
SD0332 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,679 $475 Implemented
SF0257 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $7,560 $5,632 Not Implemented