Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,551
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0272 # 07 Y:2001 | 07 | 2001 | INSTALL OCCUPANCY SENSORS | $1,313 | $1,862 | Implemented |
IA0272 # 08 Y:2001 | 08 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $337 | $740 | Not Implemented |
IA0272 # 09 Y:2001 | 09 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,544 | $445 | Implemented |
IA0272 # 10 Y:2001 | 10 | 2001 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $1,127 | $254 | Not Implemented |
IA0272 # 11 Y:2001 | 11 | 2001 | MINIMIZE WATER USAGE | $1,414 | $35 | Implemented |
IA0272 # 12 Y:2001 | 12 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $37,440 | $30,000 | n/a |
AS0300 # 01 Y:2001 | 01 | 2001 | INSTALL OCCUPANCY SENSORS | $120 | $525 | Not Implemented |
AS0300 # 02 Y:2001 | 02 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,174 | $300 | Implemented |
AS0300 # 03 Y:2001 | 03 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,824 | $30 | Implemented |
AS0300 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,272 | $60 | Not Implemented |
AS0300 # 05 Y:2001 | 05 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $815,625 | $640 | Implemented |
UM0187 # 01 Y:2001 | 01 | 2001 | INSULATE BARE EQUIPMENT | $6,100 | $800 | Not Implemented |
UM0187 # 02 Y:2001 | 02 | 2001 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $4,700 | $2,000 | Not Implemented |
UM0187 # 03 Y:2001 | 03 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,344 | $5,200 | Not Implemented |
UM0187 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,181 | $375 | Implemented |
UM0187 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,279 | $1,688 | Implemented |
UM0187 # 06 Y:2001 | 06 | 2001 | RECOVER AND REUSE COOLING WATER | $10,250 | $2,000 | Not Implemented |
UM0186 # 01 Y:2001 | 01 | 2001 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $21,500 | $4,100 | n/a |
UM0186 # 02 Y:2001 | 02 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,000 | $3,500 | n/a |
UM0186 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $7,700 | $700 | n/a |
UM0186 # 04 Y:2001 | 04 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,100 | $500 | n/a |
UM0186 # 05 Y:2001 | 05 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,000 | $300 | n/a |
UM0186 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,000 | $700 | n/a |
UM0186 # 07 Y:2001 | 07 | 2001 | OPTIMIZE PLANT POWER FACTOR | $1,500 | $2,300 | n/a |
UM0186 # 08 Y:2001 | 08 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $500 | $1,000 | n/a |