Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,551
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0246 # 02 Y:2000 | 02 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $18,200 | $10,275 | Not Implemented |
IA0246 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,060 | $0 | Implemented |
IA0246 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,799 | $202 | Implemented |
IA0246 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,999 | $0 | Implemented |
IA0246 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $445 | $25 | Not Implemented |
IA0246 # 07 Y:2000 | 07 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $378 | $56 | Not Implemented |
MA0465 # 01 Y:2000 | 01 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $34,550 | $50,000 | Not Implemented |
MA0465 # 02 Y:2000 | 02 | 2000 | OPTIMIZE PLANT POWER FACTOR | $4,076 | $4,125 | Implemented |
MA0465 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,682 | $20,325 | Not Implemented |
MA0465 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $845 | $528 | Implemented |
MA0465 # 05 Y:2000 | 05 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $605 | $400 | Implemented |
CO0464 # 01 Y:2000 | 01 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,600 | $2,200 | Implemented |
CO0464 # 02 Y:2000 | 02 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,200 | $7,000 | Not Implemented |
CO0464 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,400 | $350 | Implemented |
CO0464 # 04 Y:2000 | 04 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,060 | $0 | Not Implemented |
CO0464 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $620 | $100 | Not Implemented |
CO0464 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $470 | $0 | Not Implemented |
CO0464 # 07 Y:2000 | 07 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $40 | $0 | Not Implemented |
SD0248 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $31,001 | $40,000 | Not Implemented |
SD0248 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,837 | $14,800 | Implemented |
SD0248 # 03 Y:2000 | 03 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,532 | $7,536 | Implemented |
SD0248 # 04 Y:2000 | 04 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,585 | $0 | Implemented |
SD0248 # 05 Y:2000 | 05 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,887 | $4,950 | Implemented |
SD0248 # 06 Y:2000 | 06 | 2000 | USE EVAPORATION TO CONCENTRATE MATERIAL | $5,300 | $12,500 | Not Implemented |
SD0248 # 07 Y:2000 | 07 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $11,600 | $1,000 | Implemented |