IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

263

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0278 # 12 Y:1996 12 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,899 $740 Implemented
WI0278 # 13 Y:1996 13 1996 MINIMIZE WATER USAGE $1,424 $0 Implemented
WI0277 # 01 Y:1996 01 1996 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $18,642 $10,000 Not Implemented
WI0277 # 02 Y:1996 02 1996 INSTALL TIMERS AND/OR THERMOSTATS $6,122 $1,600 Not Implemented
WI0277 # 03 Y:1996 03 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,800 $0 Not Implemented
WI0277 # 04 Y:1996 04 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,365 $9,500 Implemented
WI0277 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,538 $1,642 Not Implemented
WI0277 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,245 $640 Not Implemented
WI0277 # 07 Y:1996 07 1996 INSTALL AUTOMATIC STACK DAMPER $1,948 $3,000 Not Implemented
WI0277 # 08 Y:1996 08 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,453 $500 Implemented
WI0277 # 09 Y:1996 09 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,309 $1,849 Not Implemented
WI0277 # 10 Y:1996 10 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $248 $700 Not Implemented
WI0267 # 01 Y:1996 01 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $27,762 $8,906 n/a
WI0267 # 02 Y:1996 02 1996 USE SYNTHETIC LUBRICANT $16,841 $0 n/a
WI0267 # 03 Y:1996 03 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,729 $45,000 n/a
WI0267 # 04 Y:1996 04 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $13,635 $39,000 n/a
WI0267 # 05 Y:1996 05 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,054 $16,740 n/a
WI0267 # 06 Y:1996 06 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $6,670 $0 n/a
WI0267 # 07 Y:1996 07 1996 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $4,867 $0 n/a
WI0267 # 08 Y:1996 08 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,040 $0 n/a
WI0267 # 09 Y:1996 09 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,236 $5,000 n/a
BD0050 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,808 $375 Implemented
BD0050 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,366 $3,420 Implemented
BD0050 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $870 $40 Not Implemented
BD0050 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $656 $525 Not Implemented