Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
263
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0278 # 12 Y:1996 | 12 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,899 | $740 | Implemented |
WI0278 # 13 Y:1996 | 13 | 1996 | MINIMIZE WATER USAGE | $1,424 | $0 | Implemented |
WI0277 # 01 Y:1996 | 01 | 1996 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $18,642 | $10,000 | Not Implemented |
WI0277 # 02 Y:1996 | 02 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $6,122 | $1,600 | Not Implemented |
WI0277 # 03 Y:1996 | 03 | 1996 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,800 | $0 | Not Implemented |
WI0277 # 04 Y:1996 | 04 | 1996 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,365 | $9,500 | Implemented |
WI0277 # 05 Y:1996 | 05 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,538 | $1,642 | Not Implemented |
WI0277 # 06 Y:1996 | 06 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,245 | $640 | Not Implemented |
WI0277 # 07 Y:1996 | 07 | 1996 | INSTALL AUTOMATIC STACK DAMPER | $1,948 | $3,000 | Not Implemented |
WI0277 # 08 Y:1996 | 08 | 1996 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,453 | $500 | Implemented |
WI0277 # 09 Y:1996 | 09 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,309 | $1,849 | Not Implemented |
WI0277 # 10 Y:1996 | 10 | 1996 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $248 | $700 | Not Implemented |
WI0267 # 01 Y:1996 | 01 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $27,762 | $8,906 | n/a |
WI0267 # 02 Y:1996 | 02 | 1996 | USE SYNTHETIC LUBRICANT | $16,841 | $0 | n/a |
WI0267 # 03 Y:1996 | 03 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,729 | $45,000 | n/a |
WI0267 # 04 Y:1996 | 04 | 1996 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $13,635 | $39,000 | n/a |
WI0267 # 05 Y:1996 | 05 | 1996 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,054 | $16,740 | n/a |
WI0267 # 06 Y:1996 | 06 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $6,670 | $0 | n/a |
WI0267 # 07 Y:1996 | 07 | 1996 | SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS | $4,867 | $0 | n/a |
WI0267 # 08 Y:1996 | 08 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,040 | $0 | n/a |
WI0267 # 09 Y:1996 | 09 | 1996 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,236 | $5,000 | n/a |
BD0050 # 01 Y:1996 | 01 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,808 | $375 | Implemented |
BD0050 # 02 Y:1996 | 02 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,366 | $3,420 | Implemented |
BD0050 # 03 Y:1996 | 03 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $870 | $40 | Not Implemented |
BD0050 # 04 Y:1996 | 04 | 1996 | INSTALL OCCUPANCY SENSORS | $656 | $525 | Not Implemented |