IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0556 # 06 Y:2004 06 2004 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $5,923 $12,926 Not Implemented
MA0556 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,167 $10,200 Implemented
MA0556 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $13,042 $6,750 Implemented
MA0556 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,720 $10,350 Implemented
MA0556 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,534 $529 Implemented
MA0556 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,840 $2,131 Implemented
MA0556 # 01 Y:2004 01 2004 IMPROVE SPACE COMFORT CONDITIONING $17,360 $17,910 Not Implemented
MA0533 # 01 Y:2003 01 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $27,237 $1,300 Not Implemented
MA0533 # 03 Y:2003 03 2003 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $10,803 $25,625 Implemented
MA0533 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,624 $6,120 Implemented
MA0533 # 02 Y:2003 02 2003 REDUCE VENTILATION AIR $16,298 $34,450 Not Implemented
MA0533 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $5,140 $15,455 Implemented
MA0533 # 04 Y:2003 04 2003 ADD AREA LIGHTING SWITCHES $8,645 $3,215 Implemented
MA0533 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,098 $1,090 Implemented
MA0522 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,884 $20,000 n/a
MA0522 # 01 Y:2002 01 2002 MINIMIZE WATER USAGE $32,733 $25,000 n/a
MA0522 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $161,660 $225,500 Not Implemented
MA0522 # 03 Y:2002 03 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $59,990 $26,000 n/a
MA0522 # 09 Y:2002 09 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $850,663 $3,285,330 Not Implemented
MA0522 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,163 $23,000 Not Implemented
MA0522 # 07 Y:2002 07 2002 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $3,709 $1,000 Implemented
MA0522 # 08 Y:2002 08 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,677 $9,000 Not Implemented
MA0522 # 05 Y:2002 05 2002 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $19,687 $55,000 Not Implemented
MA0482 # 06 Y:2001 06 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,200 $13,000 Not Implemented
MA0482 # 01 Y:2001 01 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19,400 $93,000 Not Implemented