Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0097 # 09 Y:2006 09 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $71,588 $180,000 Not Implemented
UU0097 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,113 $3,570 Not Implemented
UU0097 # 07 Y:2006 07 2006 INSTALL COMMON HEADER ON COMPRESSORS $1,960 $2,900 Not Implemented
UU0097 # 06 Y:2006 06 2006 UPGRADE CONTROLS ON COMPRESSORS $2,770 $1,500 Not Implemented
UU0097 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,191 $740 Not Implemented
UU0097 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $7,461 $4,840 Not Implemented
UU0097 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,790 $2,000 Not Implemented
UU0097 # 02 Y:2006 02 2006 INSTALL AN UNINTERUPTABLE POWER SUPPLY $177,372 $808,858 Not Implemented
UU0097 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $58,512 $25,405 Not Implemented
UU0062 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $1,690 $3,226 Not Implemented
UU0062 # 07 Y:2004 07 2004 CONDENSE OPERATION INTO ONE BUILDING $2,508,360 $6,420,700 Not Implemented
UU0062 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $262 $440 Not Implemented
UU0062 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $392 $1,990 Not Implemented
UU0062 # 03 Y:2004 03 2004 INSTALL SPECTRAL REFLECTORS / DELAMP $380 $280 Not Implemented
UU0062 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,404 $790 Implemented
UU0062 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $12,920 $20,250 Not Implemented
UU0030 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $1,624 $1,800 Implemented
UU0030 # 07 Y:2002 07 2002 USE SYNTHETIC LUBRICANT $1,211 $600 Implemented
UU0030 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $808 $0 Not Implemented
UU0030 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,080 $1,843 Not Implemented
UU0030 # 04 Y:2002 04 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $929 $200 Not Implemented
UU0030 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $379 $240 Not Implemented
UU0030 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,250 $390 Implemented