IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0360 # 02 Y:2007 02 2007 REPAIR AND ELIMINATE STEAM LEAKS $9,594 $2,250 Implemented
NC0360 # 03 Y:2007 03 2007 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $35,946 $33,785 Not Implemented
NC0360 # 04 Y:2007 04 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $12,267 $0 Implemented
NC0360 # 05 Y:2007 05 2007 DEVELOP A REPAIR/REPLACE POLICY $1,032 $662 Not Implemented
NC0360 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $12,731 $12,000 Implemented
NC0360 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $836 $300 Implemented
NC0360 # 08 Y:2007 08 2007 USE PHOTOCELL CONTROLS $761 $750 Implemented
NC0360 # 01 Y:2007 01 2007 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $20,317 $10,000 Implemented
OD0140 # 02 Y:1999 02 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,213 $100 Implemented
OD0140 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,272 $14,704 Not Implemented
OD0140 # 03 Y:1999 03 1999 REDUCE VENTILATION AIR $3,529 $140 Not Implemented
OD0140 # 04 Y:1999 04 1999 REDUCE VENTILATION AIR $2,602 $0 Not Implemented
OD0140 # 05 Y:1999 05 1999 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $510 $1,870 Not Implemented
OD0099 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,007 $11,490 Implemented
OD0099 # 02 Y:1997 02 1997 OPERATE BOILERS ON HIGH FIRE SETTING $1,495 $1,495 Implemented
OD0099 # 03 Y:1997 03 1997 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $19,847 $8,500 Not Implemented
OD0091 # 01 Y:1997 01 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,021 $1,495 Implemented
OD0091 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,157 $1,420 Implemented
OD0091 # 03 Y:1997 03 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,311 $8,736 Not Implemented
OD0091 # 04 Y:1997 04 1997 PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING $120,126 $46,000 Not Implemented
OD0091 # 05 Y:1997 05 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $13,244 $5,000 Implemented
OD0091 # 06 Y:1997 06 1997 INSTALL SENSORS TO DETECT AND AVOID JAMS $185,900 $0 Implemented
OD0014 # 04 Y:1994 04 1994 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $28,185 $14,000 Not Implemented
OD0014 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $3,144 $3,183 Not Implemented
OD0014 # 06 Y:1994 06 1994 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $5,709 $975 Implemented