Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
162
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0349 # 01 Y:2006 | 01 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $18,045 | $2,000 | Not Implemented |
NC0349 # 07 Y:2006 | 07 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,246 | $5,000 | Not Implemented |
NC0349 # 05 Y:2006 | 05 | 2006 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $19,058 | $28,785 | Not Implemented |
NC0349 # 06 Y:2006 | 06 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,087 | $4,340 | Not Implemented |
NC0349 # 02 Y:2006 | 02 | 2006 | REDUCE EXCESS STEAM BLEEDING | $23,110 | $13,525 | Not Implemented |
NC0349 # 08 Y:2006 | 08 | 2006 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $5,891 | $4,000 | Not Implemented |
NC0349 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $3,668 | $1,000 | Not Implemented |
NC0349 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $2,375 | $1,000 | Not Implemented |
MI0138 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,808 | $713 | Not Implemented |
MI0138 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,001 | $9,540 | Not Implemented |
MI0138 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,551 | $54,600 | Not Implemented |
MI0138 # 08 Y:2006 | 08 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,463 | $142 | Not Implemented |
MI0138 # 02 Y:2006 | 02 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,014 | $20,014 | Not Implemented |
MI0138 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,928 | $1,074 | Implemented |
MI0138 # 05 Y:2006 | 05 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $18,750 | $4,708 | Not Implemented |
MI0138 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,522 | $30 | Not Implemented |
WV0350 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,103 | $8,181 | Implemented |
WV0350 # 16 Y:2006 | 16 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $438 | $250 | Not Implemented |
WV0350 # 04 Y:2006 | 04 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,173 | $16,600 | Not Implemented |
WV0350 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $24,663 | $23,600 | Implemented |
WV0350 # 06 Y:2006 | 06 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,094 | $1,000 | Implemented |
WV0350 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,275 | $60 | Not Implemented |
WV0350 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,063 | $0 | Implemented |
WV0350 # 17 Y:2006 | 17 | 2006 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $333 | $0 | Not Implemented |
WV0350 # 15 Y:2006 | 15 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $454 | $640 | Not Implemented |