Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,168
matching recommendationsSIC | 2653 | Corrugated And Solid Fiber Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CM1015 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,380 | $23,925 | Implemented |
CM1015 # 04 Y:2022 | 04 | 2022 | REPLACE BOILER | $9,756 | $43,140 | Implemented |
MZ0284 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $14,842 | $19,695 | Implemented |
MZ0284 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,835 | $640 | Implemented |
MZ0284 # 01 Y:2020 | 01 | 2020 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,928 | $750 | Implemented |
MZ0284 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,092 | $320 | Implemented |
AM0784 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $27,050 | $32,150 | Implemented |
AM0784 # 05 Y:2019 | 05 | 2019 | USE SYNTHETIC LUBRICANT | $3,190 | $1,050 | Implemented |
AM0784 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,100 | $8,000 | Implemented |
AM0784 # 06 Y:2019 | 06 | 2019 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $340 | $0 | Implemented |
AM0784 # 03 Y:2019 | 03 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,980 | $1,400 | Implemented |
AM0784 # 04 Y:2019 | 04 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $2,490 | $100 | Implemented |
AM0775 # 01 Y:2019 | 01 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $35,280 | $50 | Implemented |
AM0775 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,580 | $2,000 | Implemented |
AM0775 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,540 | $11 | Implemented |
AM0775 # 05 Y:2019 | 05 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $405 | $1,320 | Implemented |
AM0775 # 08 Y:2019 | 08 | 2019 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $615 | $0 | Implemented |
WM0125 # 07 Y:2018 | 07 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $293 | $0 | Implemented |
WM0125 # 04 Y:2018 | 04 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,087 | $2,215 | Implemented |
NL0011 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,747 | $20,139 | Implemented |
NL0011 # 04 Y:2017 | 04 | 2017 | ELIMINATE PRACTICE OF MIXING WASTE STREAMS | $982 | $0 | Implemented |
AM0720 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,440 | $2,000 | Implemented |
AM0720 # 01 Y:2016 | 01 | 2016 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $189,624 | $0 | Implemented |
AM0720 # 04 Y:2016 | 04 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,240 | $0 | Implemented |
AM0720 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,600 | $5,030 | Implemented |