IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,168

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0221 # 07 Y:2001 07 2001 REPAIR OR REPLACE STEAM TRAPS $14,790 $1,000 Implemented
WV0221 # 08 Y:2001 08 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,986 $600 Implemented
WV0221 # 10 Y:2001 10 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,038 $2,000 Implemented
IA0272 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,710 $356 Implemented
IA0272 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $612 $60 Implemented
IA0272 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $1,313 $1,862 Implemented
IA0272 # 09 Y:2001 09 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,544 $445 Implemented
IA0272 # 11 Y:2001 11 2001 MINIMIZE WATER USAGE $1,414 $35 Implemented
AS0300 # 02 Y:2001 02 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,174 $300 Implemented
AS0300 # 03 Y:2001 03 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,824 $30 Implemented
AS0300 # 05 Y:2001 05 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $815,625 $640 Implemented
UM0187 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,181 $375 Implemented
UM0187 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,279 $1,688 Implemented
LL0107 # 03 Y:2001 03 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,897 $0 Implemented
LL0107 # 04 Y:2001 04 2001 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,407 $0 Implemented
LL0107 # 05 Y:2001 05 2001 RECYCLE WHITE WATER $25,896 $175,000 Implemented
MA0482 # 09 Y:2001 09 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,040 $450 Implemented
WV0198 # 01 Y:2000 01 2000 USE SYNTHETIC LUBRICANT $1,154 $560 Implemented
WV0198 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $3,752 $169 Implemented
WV0198 # 04 Y:2000 04 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,768 $800 Implemented
WV0198 # 07 Y:2000 07 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $22,060 $0 Implemented
WV0198 # 08 Y:2000 08 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,141 $23 Implemented
WV0198 # 11 Y:2000 11 2000 INSTALL SENSORS TO DETECT DEFECTS $8,580 $125 Implemented
WV0195 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $6,939 $3,252 Implemented
WV0195 # 04 Y:2000 04 2000 REPAIR OR REPLACE STEAM TRAPS $2,348 $1,368 Implemented