Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
66
matching recommendationsSIC | 2653 | Corrugated And Solid Fiber Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0391 # 02 Y:2006 | 02 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,932 | $0 | Implemented |
UF0391 # 09 Y:2006 | 09 | 2006 | USE OPTIMUM THICKNESS INSULATION | $325 | $84 | Implemented |
UF0391 # 12 Y:2006 | 12 | 2006 | USE PHOTOCELL CONTROLS | $1,978 | $30 | Implemented |
UF0391 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,679 | $0 | Implemented |
UF0391 # 08 Y:2006 | 08 | 2006 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $803 | $0 | Implemented |
UF0391 # 04 Y:2006 | 04 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $8,241 | $404 | Implemented |
UF0391 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,054 | $403 | Implemented |
UF0391 # 06 Y:2006 | 06 | 2006 | CLOSE OFF UNNEEDED STEAM LINES | $9,659 | $0 | Implemented |
MI0114 # 02 Y:2005 | 02 | 2005 | IMPROVE COMBUSTION CONTROL CAPABILITY | $20,574 | $30,050 | Implemented |
MI0114 # 04 Y:2005 | 04 | 2005 | INSULATE BARE EQUIPMENT | $2,983 | $225 | Implemented |
MI0114 # 05 Y:2005 | 05 | 2005 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $9,790 | $4,360 | Implemented |
MI0114 # 06 Y:2005 | 06 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,392 | $77 | Implemented |
MI0114 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,896 | $1,074 | Implemented |
MI0114 # 08 Y:2005 | 08 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $3,882 | $0 | Implemented |
UF0335 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,359 | $376 | Implemented |
UF0335 # 07 Y:2004 | 07 | 2004 | OPTIMIZE PLANT POWER FACTOR | $3,237 | $20,000 | Implemented |
UF0335 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,790 | $13,573 | Implemented |
UF0335 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,089 | $41,729 | Implemented |
MI0061 # 06 Y:2003 | 06 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,157 | $147 | Implemented |
MI0061 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $524 | $111 | Implemented |
MI0061 # 04 Y:2003 | 04 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,962 | $6 | Implemented |
MI0061 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $974 | $332 | Implemented |
UF0320 # 09 Y:2003 | 09 | 2003 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $448,198 | $37,200 | Implemented |
UF0320 # 03 Y:2003 | 03 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $1,161 | $225 | Implemented |
UF0320 # 01 Y:2003 | 01 | 2003 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $25,707 | $48,985 | Implemented |