Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
118
matching recommendationsSIC | 2653 | Corrugated And Solid Fiber Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0784 # 05 Y:2019 | 05 | 2019 | USE SYNTHETIC LUBRICANT | $3,190 | $1,050 | Implemented |
AM0784 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,100 | $8,000 | Implemented |
AM0784 # 06 Y:2019 | 06 | 2019 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $340 | $0 | Implemented |
AM0784 # 03 Y:2019 | 03 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,980 | $1,400 | Implemented |
AM0784 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $27,050 | $32,150 | Implemented |
AM0784 # 04 Y:2019 | 04 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $2,490 | $100 | Implemented |
AM0775 # 01 Y:2019 | 01 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $35,280 | $50 | Implemented |
AM0775 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,580 | $2,000 | Implemented |
AM0775 # 08 Y:2019 | 08 | 2019 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $615 | $0 | Implemented |
AM0775 # 05 Y:2019 | 05 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $405 | $1,320 | Implemented |
AM0775 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,540 | $11 | Implemented |
AM0720 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,170 | $800 | Implemented |
AM0720 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,600 | $5,030 | Implemented |
AM0720 # 04 Y:2016 | 04 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,240 | $0 | Implemented |
AM0720 # 01 Y:2016 | 01 | 2016 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $189,624 | $0 | Implemented |
AM0720 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,440 | $2,000 | Implemented |
AM0714 # 02 Y:2016 | 02 | 2016 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $30,947 | $15,000 | Implemented |
AM0714 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,435 | $1,000 | Implemented |
OK0943 # 02 Y:2016 | 02 | 2016 | PAY UTILITY BILLS ON TIME | $21,826 | $0 | Implemented |
OK0943 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,211 | $0 | Implemented |
OK0943 # 01 Y:2016 | 01 | 2016 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $40,741 | $19,000 | Implemented |
OK0943 # 06 Y:2016 | 06 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $645 | $1,405 | Implemented |
OK0943 # 09 Y:2016 | 09 | 2016 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,934 | $2,720 | Implemented |
OK0943 # 08 Y:2016 | 08 | 2016 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $5,953 | $4,600 | Implemented |
OK0943 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,445 | $11,700 | Implemented |