IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0212 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $999 $2,975 Not Implemented
BD0212 # 09 Y:2002 09 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $931 $1,000 Implemented
BD0212 # 10 Y:2002 10 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $346 $333 Implemented
BD0212 # 11 Y:2002 11 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $2,259 $3,600 Not Implemented
BD0212 # 12 Y:2002 12 2002 MINIMIZE WATER USAGE $219 $1,000 Not Implemented
BD0212 # 13 Y:2002 13 2002 INSTALL EQUIPMENT TO MOVE PRODUCT $182,593 $180,000 n/a
BD0212 # 14 Y:2002 14 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $59,860 $35,000 n/a
BD0212 # 15 Y:2002 15 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,000 $2,500 Not Implemented
BD0212 # 16 Y:2002 16 2002 AUTOMATE PAYROLL SYSTEM $3,016 $2,495 Not Implemented
IC0029 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,828 $3,000 Implemented
IC0029 # 13 Y:2002 13 2002 MODIFY WORKLOAD $150,000 $32,000 Not Implemented
IC0029 # 14 Y:2002 14 2002 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $102,000 $8,500 Not Implemented
IC0029 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $1,907 $3,610 Implemented
IC0029 # 02 Y:2002 02 2002 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $9,300 $1,320 Not Implemented
IC0029 # 03 Y:2002 03 2002 REPAIR AND ELIMINATE STEAM LEAKS $10,646 $900 Implemented
IC0029 # 05 Y:2002 05 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,179 $1,500 Implemented
IC0029 # 06 Y:2002 06 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $36,712 $36,036 Implemented
IC0029 # 08 Y:2002 08 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $18,000 $3,280 Not Implemented
IC0029 # 12 Y:2002 12 2002 INSTALL OCCUPANCY SENSORS $962 $2,112 Not Implemented
IC0029 # 11 Y:2002 11 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,182 $4,751 Not Implemented
IC0029 # 10 Y:2002 10 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,519 $20,549 Not Implemented
IC0029 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,753 $49,560 Not Implemented
IC0029 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $1,616 $906 Implemented
BD0201 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $917 $1,000 Not Implemented
BD0201 # 01 Y:2002 01 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,916 $9,150 Not Implemented