IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,547

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0164 # 02 Y:1985 02 1985 INSTALL STORM WINDOWS AND DOORS $1,368 $1,226 Implemented
UD0164 # 03 Y:1985 03 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,756 $25,000 Implemented
UD0164 # 04 Y:1985 04 1985 RECOVER WASTE HEAT FROM EQUIPMENT $4,000 $13,000 Not Implemented
GT0236 # 01 Y:1984 01 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $49 $0 Implemented
GT0236 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,120 $50 Implemented
GT0236 # 03 Y:1984 03 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,182 $0 Not Implemented
GT0236 # 04 Y:1984 04 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,004 $0 Implemented
GT0236 # 05 Y:1984 05 1984 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,625 $5,000 Not Implemented
GT0236 # 06 Y:1984 06 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $356 $546 Implemented
GT0236 # 07 Y:1984 07 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,323 $2,000 Not Implemented
KU0134 # 01 Y:1984 01 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $22,362 $30,000 Not Implemented
KU0134 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,178 $22,400 Not Implemented
KU0134 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,241 $3,991 Implemented
KU0134 # 04 Y:1984 04 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,694 $3,800 Implemented
KU0134 # 05 Y:1984 05 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,505 $986 Implemented
KU0134 # 06 Y:1984 06 1984 INSTALL TURBULATORS $3,913 $700 Not Implemented
KU0134 # 07 Y:1984 07 1984 REPAIR AND ELIMINATE STEAM LEAKS $2,701 $0 Implemented
KU0134 # 08 Y:1984 08 1984 INSTALL AUTOMATIC STACK DAMPER $1,739 $3,900 Not Implemented
KU0134 # 09 Y:1984 09 1984 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,941 $5,000 Not Implemented
KU0134 # 10 Y:1984 10 1984 USE MINIMUM STEAM OPERATING PRESSURE $1,264 $0 Not Implemented
KU0134 # 11 Y:1984 11 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,273 $1,069 Not Implemented
KU0134 # 12 Y:1984 12 1984 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $457 $0 Not Implemented
KU0134 # 13 Y:1984 13 1984 INSULATE BARE EQUIPMENT $328 $217 Not Implemented
KU0134 # 14 Y:1984 14 1984 IMPROVE LUBRICATION PRACTICES $7,532 $3,000 Not Implemented
KU0134 # 15 Y:1984 15 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,352 $0 Implemented