Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
194
matching recommendationsSIC | 2653 | Corrugated And Solid Fiber Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0663 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,102 | $3,252 | n/a |
SD0663 # 10 Y:2025 | 10 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,427 | $3,278 | n/a |
SD0663 # 06 Y:2025 | 06 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,191 | $0 | n/a |
SD0663 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $672,356 | $643,693 | n/a |
SD0663 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,214 | $18,590 | n/a |
SD0663 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,623 | $500 | n/a |
SD0663 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $314,276 | $12,865 | n/a |
SD0663 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,060 | $4,266 | n/a |
SD0663 # 09 Y:2025 | 09 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,465 | $3,200 | n/a |
SD0663 # 11 Y:2025 | 11 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,593 | $35,000 | n/a |
SD0663 # 08 Y:2025 | 08 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,107 | $2,287 | n/a |
SD0498 # 05 Y:2015 | 05 | 2015 | INCREASE AMOUNT OF CONDENSATE RETURNED | $3,194 | $8,000 | Implemented |
SD0498 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,814 | $500 | Implemented |
SD0498 # 03 Y:2015 | 03 | 2015 | REDUCE EXCESS STEAM BLEEDING | $10,701 | $14,842 | Not Implemented |
SD0498 # 02 Y:2015 | 02 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,048 | $21,000 | Not Implemented |
SD0498 # 06 Y:2015 | 06 | 2015 | USE PHOTOCELL CONTROLS | $1,009 | $440 | Not Implemented |
SD0498 # 01 Y:2015 | 01 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $14,239 | $1,000 | Implemented |
SF0463 # 08 Y:2015 | 08 | 2015 | REPAIR OR REPLACE STEAM TRAPS | $7,199 | $7,920 | Implemented |
SF0463 # 01 Y:2015 | 01 | 2015 | USE POWER DURING OFF-PEAK PERIODS | $3,922 | $0 | Not Implemented |
SF0463 # 05 Y:2015 | 05 | 2015 | INSULATE BARE EQUIPMENT | $3,340 | $721 | Implemented |
SF0463 # 06 Y:2015 | 06 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $28,979 | $14,516 | Implemented |
SF0463 # 15 Y:2015 | 15 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,394 | $16,788 | Implemented |
SF0463 # 07 Y:2015 | 07 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,451 | $2,500 | Not Implemented |
SF0463 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $366 | $0 | Implemented |
SF0463 # 02 Y:2015 | 02 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,820 | $110 | Implemented |