Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsSIC | 2653 | Corrugated And Solid Fiber Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0533 # 07 Y:2003 | 07 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,098 | $1,090 | Implemented |
MA0533 # 06 Y:2003 | 06 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,624 | $6,120 | Implemented |
MA0533 # 05 Y:2003 | 05 | 2003 | OPTIMIZE PLANT POWER FACTOR | $5,140 | $15,455 | Implemented |
MA0533 # 04 Y:2003 | 04 | 2003 | ADD AREA LIGHTING SWITCHES | $8,645 | $3,215 | Implemented |
MA0533 # 03 Y:2003 | 03 | 2003 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $10,803 | $25,625 | Implemented |
MA0533 # 02 Y:2003 | 02 | 2003 | REDUCE VENTILATION AIR | $16,298 | $34,450 | Not Implemented |
MA0533 # 01 Y:2003 | 01 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $27,237 | $1,300 | Not Implemented |
MA0522 # 04 Y:2002 | 04 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,884 | $20,000 | n/a |
MA0522 # 09 Y:2002 | 09 | 2002 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $850,663 | $3,285,330 | Not Implemented |
MA0522 # 08 Y:2002 | 08 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,677 | $9,000 | Not Implemented |
MA0522 # 06 Y:2002 | 06 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,163 | $23,000 | Not Implemented |
MA0522 # 07 Y:2002 | 07 | 2002 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $3,709 | $1,000 | Implemented |
MA0522 # 03 Y:2002 | 03 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $59,990 | $26,000 | n/a |
MA0522 # 05 Y:2002 | 05 | 2002 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $19,687 | $55,000 | Not Implemented |
MA0522 # 02 Y:2002 | 02 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $161,660 | $225,500 | Not Implemented |
MA0522 # 01 Y:2002 | 01 | 2002 | MINIMIZE WATER USAGE | $32,733 | $25,000 | n/a |
MA0482 # 12 Y:2001 | 12 | 2001 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,000 | $600 | Not Implemented |
MA0482 # 01 Y:2001 | 01 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $19,400 | $93,000 | Not Implemented |
MA0482 # 11 Y:2001 | 11 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,500 | $7,000 | Not Implemented |
MA0482 # 07 Y:2001 | 07 | 2001 | RECYCLE WHITE WATER | $5,000 | $20,000 | Not Implemented |
MA0482 # 06 Y:2001 | 06 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,200 | $13,000 | Not Implemented |
MA0482 # 05 Y:2001 | 05 | 2001 | USE RADIANT HEATER FOR SPOT HEATING | $5,430 | $25,000 | Not Implemented |
MA0482 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,900 | $23,000 | Not Implemented |
MA0482 # 03 Y:2001 | 03 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,590 | $30,000 | Not Implemented |
MA0482 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $15,900 | $13,000 | Not Implemented |