Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0641 # 04 Y:2002 04 2002 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $17,780 $20,000 Not Implemented
UD0641 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,888 $59,307 Not Implemented
UD0641 # 02 Y:2002 02 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,699 $37,000 Not Implemented
UD0641 # 01 Y:2002 01 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $72,243 $0 Not Implemented
UD0641 # 10 Y:2002 10 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,588 $2,500 Implemented
UD0641 # 11 Y:2002 11 2002 INSTALL OCCUPANCY SENSORS $2,180 $121 Not Implemented
UD0641 # 12 Y:2002 12 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,957 $9,969 Implemented
UD0641 # 13 Y:2002 13 2002 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,451 $5,000 Not Implemented
UD0641 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,676 $22,800 Implemented
UD0641 # 06 Y:2002 06 2002 USE RADIANT HEATER FOR SPOT HEATING $15,849 $22,500 Not Implemented
UD0641 # 03 Y:2002 03 2002 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $28,507 $400 Implemented
UD0641 # 09 Y:2002 09 2002 DISCONNECT BALLASTS $2,709 $1,968 Not Implemented
UD0641 # 08 Y:2002 08 2002 REPROCESS SPENT OILS ON SITE FOR RE-USE $3,403 $3,400 Not Implemented
UD0641 # 14 Y:2002 14 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,060 $0 Not Implemented
UD0641 # 15 Y:2002 15 2002 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $673 $1,275 Not Implemented
UD0556 # 02 Y:1998 02 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $19,800 $0 Implemented
UD0556 # 08 Y:1998 08 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $532 $200 Implemented
UD0556 # 01 Y:1998 01 1998 $189,046 $0 Implemented
UD0556 # 07 Y:1998 07 1998 OPTIMIZE PLANT POWER FACTOR $1,680 $2,250 Implemented
UD0556 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,784 $0 Implemented
UD0556 # 06 Y:1998 06 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,459 $0 Implemented
UD0556 # 03 Y:1998 03 1998 ADJUST BURNERS FOR EFFICIENT OPERATION $8,037 $200 Implemented
UD0556 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,225 $11,147 Implemented
UM0123 # 01 Y:1998 01 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,378 $2,188 Not Implemented
UM0123 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,806 $500 Not Implemented