Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
71
matching recommendationsSIC | 2653 | Corrugated And Solid Fiber Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0494 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $380 | $0 | Implemented |
CO0494 # 01 Y:2001 | 01 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $17,000 | $12,000 | Not Implemented |
CO0494 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,820 | $250 | Implemented |
CO0494 # 03 Y:2001 | 03 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,090 | $800 | Not Implemented |
CO0494 # 04 Y:2001 | 04 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $80 | $199 | Implemented |
TA0014 # 06 Y:2001 | 06 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $663 | $150 | Not Implemented |
TA0014 # 04 Y:2001 | 04 | 2001 | INSTALL OCCUPANCY SENSORS | $1,516 | $320 | Implemented |
TA0014 # 03 Y:2001 | 03 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,675 | $170 | Implemented |
TA0014 # 02 Y:2001 | 02 | 2001 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $8,100 | $11,960 | Implemented |
TA0014 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,011 | $989 | Implemented |
TA0014 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $185 | $345 | Implemented |
TA0014 # 01 Y:2001 | 01 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $7,969 | $1,900 | Implemented |
WV0221 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $394 | $60 | Implemented |
WV0221 # 10 Y:2001 | 10 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,038 | $2,000 | Implemented |
WV0221 # 07 Y:2001 | 07 | 2001 | REPAIR OR REPLACE STEAM TRAPS | $14,790 | $1,000 | Implemented |
WV0221 # 08 Y:2001 | 08 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,986 | $600 | Implemented |
WV0221 # 05 Y:2001 | 05 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $12,579 | $1,200 | Implemented |
WV0221 # 06 Y:2001 | 06 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,330 | $3,980 | Implemented |
WV0221 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $8,016 | $866 | Implemented |
WV0221 # 04 Y:2001 | 04 | 2001 | OPTIMIZE PLANT POWER FACTOR | $11,836 | $8,422 | Implemented |
WV0221 # 11 Y:2001 | 11 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $15,000 | $6,000 | Not Implemented |
WV0221 # 09 Y:2001 | 09 | 2001 | RECYCLE FLUORESCENT LAMPS | $3,048 | $320 | Not Implemented |
WV0221 # 01 Y:2001 | 01 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,200 | $3,420 | Implemented |
IA0272 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,418 | $8,938 | Not Implemented |
IA0272 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $612 | $60 | Implemented |