IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 2657 Folding Paperboard Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0836 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $11,122 $22,750 Not Implemented
GT0836 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,938 $54,630 Implemented
GT0836 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $239,330 $464,160 Not Implemented
GT0836 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,676 $5,730 Not Implemented
GT0836 # 04 Y:2007 04 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,640 $51,790 Not Implemented
GT0836 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $9,709 $600 Implemented
GT0836 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,785 $6,280 Implemented
GT0836 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,543 $3,750 Implemented
GT0725 # 02 Y:2002 02 2002 INSTALL SYSTEM TO COLLECT SCRAP $540,000 $192,000 Not Implemented
GT0725 # 09 Y:2002 09 2002 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $19,275 $45,000 Not Implemented
GT0725 # 08 Y:2002 08 2002 FILTER AND REUSE HYDRAULIC OIL $1,900 $0 Implemented
GT0725 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,114 $400 Implemented
GT0725 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,301 $10,007 Implemented
GT0725 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $10,185 $35,000 Not Implemented
GT0725 # 04 Y:2002 04 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $2,446 $2,550 Implemented
GT0725 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,758 $0 Not Implemented
GT0725 # 01 Y:2002 01 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $43,102 $10,500 Implemented
GT0721 # 06 Y:2001 06 2001 AUTOMATE FINISHING PROCESS $806,400 $3,500,000 n/a
GT0721 # 05 Y:2001 05 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $28,530 $15,000 n/a
GT0721 # 04 Y:2001 04 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $705 $60 n/a
GT0721 # 03 Y:2001 03 2001 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $38,845 $80,000 n/a
GT0721 # 02 Y:2001 02 2001 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $25,375 $0 n/a
GT0721 # 01 Y:2001 01 2001 RECOVER WASTE HEAT FROM EQUIPMENT $12,360 $5,050 n/a
GT0569 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,180 $18,800 Implemented
GT0569 # 08 Y:1995 08 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $817,000 $255,250 Not Implemented