IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 2657 Folding Paperboard Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0122 # 09 Y:2013 09 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $576 $500 Implemented
MZ0122 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $807 $37 Not Implemented
MZ0122 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,732 $281 Implemented
MZ0122 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $1,742 $1,240 Implemented
MZ0122 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,872 $1,308 Implemented
MZ0122 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,176 $4,981 Implemented
MZ0122 # 03 Y:2013 03 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,627 $1,000 Implemented
MZ0122 # 02 Y:2013 02 2013 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,133 $21,200 Not Implemented
MZ0122 # 01 Y:2013 01 2013 INSULATE BARE EQUIPMENT $21,142 $3,276 Implemented
KU0383 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,816 $2,607 Implemented
KU0383 # 11 Y:1992 11 1992 ELIMINATE LEAKS IN WATER LINES AND VALVES $9 $0 Not Implemented
KU0383 # 10 Y:1992 10 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $549 $40 Not Implemented
KU0383 # 09 Y:1992 09 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $412 $200 Implemented
KU0383 # 08 Y:1992 08 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $170 $0 Not Implemented
KU0383 # 07 Y:1992 07 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $406 $0 Not Implemented
KU0383 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $2,508 $1,900 Not Implemented
KU0383 # 04 Y:1992 04 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $275 $80 Implemented
KU0383 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,893 $1,380 Not Implemented
KU0383 # 02 Y:1992 02 1992 RECOVER WASTE HEAT FROM EQUIPMENT $2,849 $0 Implemented
KU0383 # 01 Y:1992 01 1992 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $5,666 $0 Not Implemented
KU0206 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,289 $5,696 Implemented
KU0206 # 12 Y:1986 12 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $115 $0 Implemented
KU0206 # 11 Y:1986 11 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $183 $100 Implemented
KU0206 # 10 Y:1986 10 1986 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $239 $0 Implemented
KU0206 # 09 Y:1986 09 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $979 $0 Not Implemented