Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
49
matching recommendationsSIC | 267 | Misc. Converted Paper Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0439 # 10 Y:2011 | 10 | 2011 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,477 | $144 | Implemented |
WV0439 # 09 Y:2011 | 09 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,194 | $468 | Implemented |
WV0439 # 08 Y:2011 | 08 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,735 | $96 | Implemented |
WV0439 # 06 Y:2011 | 06 | 2011 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $20,648 | $4,000 | Implemented |
WV0439 # 04 Y:2011 | 04 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $23,664 | $1,202 | Implemented |
WV0439 # 11 Y:2011 | 11 | 2011 | INSULATE BARE EQUIPMENT | $4,234 | $972 | Implemented |
WV0439 # 14 Y:2011 | 14 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,083 | $3,000 | Implemented |
WV0439 # 15 Y:2011 | 15 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $631 | $1,000 | Implemented |
LL0362 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,629 | $61,377 | Implemented |
LL0362 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,621 | $360 | Implemented |
LL0362 # 01 Y:2011 | 01 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $18,083 | $810 | Implemented |
SF0403 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,239 | $720 | Implemented |
SF0403 # 08 Y:2011 | 08 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,944 | $9,877 | Implemented |
SF0403 # 06 Y:2011 | 06 | 2011 | INSTALL OCCUPANCY SENSORS | $1,801 | $5,900 | Implemented |
SF0403 # 03 Y:2011 | 03 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $681 | $1,471 | Implemented |
SF0403 # 02 Y:2011 | 02 | 2011 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,307 | $2,006 | Implemented |
GT0886 # 03 Y:2011 | 03 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $3,617 | $9,994 | Implemented |
GT0886 # 05 Y:2011 | 05 | 2011 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $24,782 | $14,000 | Implemented |
GT0886 # 04 Y:2011 | 04 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $51,129 | $25,000 | Implemented |
GT0886 # 02 Y:2011 | 02 | 2011 | METER WASTE WATER | $5,529 | $2,500 | Implemented |
UM0389 # 07 Y:2011 | 07 | 2011 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $12,809 | $9,821 | Implemented |
UM0389 # 05 Y:2011 | 05 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $891 | $5,000 | Implemented |
UM0389 # 04 Y:2011 | 04 | 2011 | INSTALL OCCUPANCY SENSORS | $2,426 | $1,142 | Implemented |
UM0389 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,425 | $4,815 | Implemented |
MZ0064 # 05 Y:2011 | 05 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,258 | $1,800 | Implemented |