Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,112
matching recommendationsSIC | 267 | Misc. Converted Paper Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0301 # 04 Y:1994 | 04 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,228 | $0 | Implemented |
MA0301 # 05 Y:1994 | 05 | 1994 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $3,790 | $1,236 | Not Implemented |
MA0301 # 06 Y:1994 | 06 | 1994 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $1,830 | $5,906 | Not Implemented |
MA0301 # 07 Y:1994 | 07 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,277 | $2,540 | Not Implemented |
AR0020 # 01 Y:1994 | 01 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,988 | $250 | Implemented |
AR0020 # 02 Y:1994 | 02 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,843 | $1,300 | Implemented |
AR0020 # 03 Y:1994 | 03 | 1994 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $3,547 | $5,250 | Implemented |
AR0020 # 04 Y:1994 | 04 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,351 | $2,100 | Implemented |
AR0020 # 05 Y:1994 | 05 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,102 | $712 | Implemented |
AR0020 # 06 Y:1994 | 06 | 1994 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,983 | $670 | Implemented |
GT0517 # 01 Y:1994 | 01 | 1994 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,170 | $1,200 | n/a |
GT0517 # 02 Y:1994 | 02 | 1994 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $170 | $360 | n/a |
GT0517 # 03 Y:1994 | 03 | 1994 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $522 | $1,200 | n/a |
GT0517 # 04 Y:1994 | 04 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $99 | $0 | n/a |
AM0205 # 01 Y:1994 | 01 | 1994 | OPTIMIZE PLANT POWER FACTOR | $14,843 | $23,805 | Implemented |
AM0205 # 02 Y:1994 | 02 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,830 | $0 | Implemented |
AM0205 # 03 Y:1994 | 03 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,430 | $0 | Implemented |
AM0205 # 04 Y:1994 | 04 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,170 | $630 | Implemented |
AM0205 # 05 Y:1994 | 05 | 1994 | INSULATE BARE EQUIPMENT | $3,660 | $1,890 | Implemented |
AM0205 # 06 Y:1994 | 06 | 1994 | INSTALL SKYLIGHTS | $3,915 | $0 | Not Implemented |
AM0205 # 07 Y:1994 | 07 | 1994 | INSULATE BARE EQUIPMENT | $2,800 | $490 | Implemented |
AM0205 # 08 Y:1994 | 08 | 1994 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $590 | $80 | Implemented |
AM0205 # 09 Y:1994 | 09 | 1994 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $433 | $0 | Implemented |
MO0113 # 01 Y:1994 | 01 | 1994 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $11,008 | $5,100 | Not Implemented |
MO0113 # 02 Y:1994 | 02 | 1994 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $405 | $30 | Not Implemented |