IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,112

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0003 # 03 Y:2012 03 2012 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,223 $0 Not Implemented
WM0003 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $226 $120 Implemented
WM0003 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $137 $360 Implemented
WM0003 # 06 Y:2012 06 2012 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $493 $99 Not Implemented
WM0003 # 07 Y:2012 07 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,160 $900 Not Implemented
TT0093 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,234 $10,343 Not Implemented
TT0093 # 02 Y:2012 02 2012 INSTALL WIND POWERED ELECTRIC GENERATOR $29,491 $250,000 Not Implemented
TT0093 # 03 Y:2012 03 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,625 $52,000 Implemented
TT0093 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,350 $800 Implemented
TT0093 # 05 Y:2012 05 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,014 $7,685 Implemented
MI0224 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,266 $11,960 Implemented
MI0224 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $14,666 $2,135 Not Implemented
MI0224 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,947 $12,324 Implemented
MI0224 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,323 $3,480 Implemented
MI0224 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,130 $1,660 Implemented
MI0224 # 06 Y:2012 06 2012 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $996 $2,594 Implemented
MI0224 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $1,962 $520 Implemented
MI0224 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,668 $80 Implemented
MI0224 # 09 Y:2012 09 2012 INSTALL SKYLIGHTS $1,608 $5,550 Not Implemented
MI0224 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $1,230 Implemented
BD0414 # 01 Y:2012 01 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $68,497 $102,400 Not Implemented
BD0414 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,674 $20 Not Implemented
BD0414 # 03 Y:2012 03 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,975 $1,200 Not Implemented
BD0414 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,526 $1,500 Not Implemented
BD0414 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,204 $4,750 Implemented