Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
159
matching recommendationsSIC | 267 | Misc. Converted Paper Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0247 # 05 Y:2002 | 05 | 2002 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,412 | $2,100 | Implemented |
WV0247 # 06 Y:2002 | 06 | 2002 | INSULATE BARE EQUIPMENT | $5,402 | $305 | Implemented |
WV0247 # 07 Y:2002 | 07 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $8,312 | $400 | Implemented |
WV0247 # 08 Y:2002 | 08 | 2002 | INSTALL OCCUPANCY SENSORS | $1,554 | $970 | Implemented |
WV0247 # 09 Y:2002 | 09 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $346 | $2,010 | Implemented |
WV0247 # 10 Y:2002 | 10 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,136 | $2,744 | Not Implemented |
WV0247 # 11 Y:2002 | 11 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $396 | $956 | Not Implemented |
WV0247 # 12 Y:2002 | 12 | 2002 | RECOVER AND REUSE COOLING WATER | $14,103 | $7,000 | Not Implemented |
WV0247 # 13 Y:2002 | 13 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $14,000 | $6,000 | Not Implemented |
UD0626 # 01 Y:2001 | 01 | 2001 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $49,350 | $4,680 | Not Implemented |
UD0626 # 02 Y:2001 | 02 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,653 | $0 | Implemented |
UD0626 # 03 Y:2001 | 03 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,326 | $1,000 | Implemented |
UD0626 # 04 Y:2001 | 04 | 2001 | ADJUST VENTS TO MINIMIZE ENERGY USE | $2,451 | $112 | Implemented |
UD0626 # 05 Y:2001 | 05 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,173 | $364 | Implemented |
UD0626 # 06 Y:2001 | 06 | 2001 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,158 | $1,050 | Implemented |
UD0626 # 07 Y:2001 | 07 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,847 | $42 | Implemented |
UD0626 # 08 Y:2001 | 08 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,587 | $423 | Implemented |
UD0626 # 09 Y:2001 | 09 | 2001 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $860 | $250 | Implemented |
UD0626 # 10 Y:2001 | 10 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $580 | $2,526 | Implemented |
UD0626 # 11 Y:2001 | 11 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $514 | $0 | Not Implemented |
UD0594 # 01 Y:2000 | 01 | 2000 | CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING | $189,338 | $180,000 | Not Implemented |
UD0594 # 02 Y:2000 | 02 | 2000 | INSTALL EQUIPMENT TO MOVE PRODUCT | $145,552 | $100,000 | Not Implemented |
UD0594 # 03 Y:2000 | 03 | 2000 | USE PHOTOCELL CONTROLS | $342 | $0 | Implemented |
UD0518 # 01 Y:1997 | 01 | 1997 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,625 | $250 | n/a |
UD0518 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,672 | $6,965 | n/a |