Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,112

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0236 # 10 Y:2002 10 2002 RECOVER WASTE HEAT FROM EQUIPMENT $8,237 $2,163 Not Implemented
WV0236 # 11 Y:2002 11 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,850 $1,537 Not Implemented
WV0236 # 12 Y:2002 12 2002 INSTALL EQUIPMENT TO MOVE PRODUCT $21,840 $13,000 Not Implemented
WV0236 # 13 Y:2002 13 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $14,000 $6,000 Not Implemented
UF0294 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $2,667 $654 Implemented
UF0294 # 02 Y:2002 02 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,905 $4,220 Implemented
UF0294 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,603 $14,749 Implemented
UF0294 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $651 $0 Implemented
UF0294 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $3,038 $820 Not Implemented
UF0294 # 06 Y:2002 06 2002 USE PHOTOCELL CONTROLS $4,538 $20,450 Not Implemented
UF0294 # 07 Y:2002 07 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,139 $18,574 Not Implemented
UF0294 # 08 Y:2002 08 2002 INSULATE BARE EQUIPMENT $8,307 $2,282 Not Implemented
UF0294 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $11,700 $7,000 Implemented
UF0294 # 10 Y:2002 10 2002 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $8,320 $32,000 Implemented
UF0294 # 11 Y:2002 11 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,880 $13,500 Not Implemented
BD0204 # 01 Y:2002 01 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,982 $2,000 Not Implemented
BD0204 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,400 $0 Not Implemented
BD0204 # 03 Y:2002 03 2002 USE RADIANT HEATER FOR SPOT HEATING $5,276 $11,250 Not Implemented
BD0204 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $3,761 $3,375 Not Implemented
BD0204 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,268 $2,000 Implemented
BD0204 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,628 $2,850 Implemented
BD0204 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $364 $1,200 Implemented
BD0204 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $227 $223 Implemented
BD0204 # 09 Y:2002 09 2002 USE RE-USABLE FILTERS $16,560 $500 Not Implemented
BD0204 # 10 Y:2002 10 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $4,010 $3,600 Not Implemented